Aqualisa Aquastream Thermo Installation Instructions Manual Download Page 6

Aquastream Thermo thermostatic integral power shower

installation instuctions

page 6

Step-by-step instructions

In addition to the guide below it is essential that the written instructions

overleaf are read and understood and that you have all the necessary

components (shown overleaf) before commencing installation. Failure to

install the product in accordance with these instructions may adversely affect

the warranty terms and conditions. All showers requiring an electrical

connection must be installed by a qualified person following the latest

revision of BS 7671 (Wiring Regulations) and certified to current building

regulations.

!

The Aquastream Thermo is supplied with universal fixings.

!

Using the template provided, mark out the

fixing points and entry point for the low

voltage cable and rear entry pipe work as

necessary. Remove the template and

prepare suitable wall fixings and entry

points as required.

1

Site the transformer within 4 metres cable distance from the Aquastream

Thermo unit. Ensure that there is free air movement around the transformer

housing. Do not fit close to heating or hot water pipes as the transformer has

a maximum operating temperature of 40ºC. If the transformer is to be sited

in the bathroom area, it must be sited away from the bather behind a screw

panel. Allow 150mm working end of low voltage cable to project from the

wall. Suitable electrical conduit should be used to protect exposed or

concealed cables.

2

DO NOT MAKE ANY ELECTRICAL CONNECTIONS AT THIS POINT.

!

Typical gravity system installation

Supply

Vent and draw-off

pipe to hot water

Underside of cistern

Highest point

must be below

underside of 

cistern

Hot water

cylinder

Connect

‘A’ or ‘B’

Cold feed

to cylinder

B

A

Summary of Contents for Aquastream Thermo

Page 1: ...ctronic Equipment Producer Responsibility Regulation 2004 This product is outside the scope of the European Waste Electrical and Electronic Equipment Directive as interpreted within the UK In the UK t...

Page 2: ...Aquastream Thermo thermostatic integral power shower installation instuctions page 2 Aquastream Aquastream Thermostatic integral power shower...

Page 3: ...Aquastream Thermo thermostatic integral power shower installation instuctions page 3 Components...

Page 4: ...N FOLLOWING THE LATEST REVISION OF BS 7671 WIRING REGULATIONS AND CERTIFIED TO CURRENT BUILDING REGULATIONS The Aquastream Thermo is suitable for household use only This product is not intended for us...

Page 5: ...side of the cistern The casing must not be sited where it is subjected to continuous spray from the shower head Stored water capacities The minimum capacity of the cold storage cistern should not be l...

Page 6: ...y point for the low voltage cable and rear entry pipe work as necessary Remove the template and prepare suitable wall fixings and entry points as required 1 Site the transformer within 4 metres cable...

Page 7: ...entry concealed pipe work or exposed top or bottom entry pipe work Rear entry installation The 15mm supply pipes must emerge at 90 angles from the finished wall surface spaced at 65mm centres Ensurin...

Page 8: ...lower fixing screw and tighten the upper fixing screws 10 The pipe insertion depth measured from the point of entry into the top fitting is 160mm at 65mm centres Where plate copper tube is to be used...

Page 9: ...ed with a flat face which must be aligned before the knob is fitted Temporarily fit the on off control knob and rotate fully clockwise to the off position Turn the supplies on to check for leaks upstr...

Page 10: ...sformer assembly THE POWER SUPPLY TO THE AQUASTREAM THERMO MUST BE ISOLATED BEFORE REINSTATING THE DOMESTIC ELECTRICAL SUPPLY ALL COPPER PIPE WORK MUST BE CROSS BONDED AND CONNECTED TO A RELIABLE EART...

Page 11: ...itting into position into the top rail end body and secure the rail assembly to wall using the screws provided ensuring the rail and rail end bodies remain firmly engaged 27 Place the rail end covers...

Page 12: ...e lever screws into the top threaded hole in the temperature adaptor ring about 4 turns should be sufficient 4 To set the maximum desired temperature insert a limit pin into the mid position hole in t...

Page 13: ...aximum operating periods for this shower are 15mins on 45mins off Trouble shooting guide Check the fuse in the spur box or plug Check transformer cut out Symptom No power supply to the pump Pump fails...

Page 14: ...60010 Republic of Ireland 01 844 3212 Brochure Hotline 0800 652 3669 Website www aqualisa co uk Email enquiries aqualisa co uk Please note that calls may be recorded for training and quality purposes...

Reviews: