
English
7
OptimusBioSaver2in1
1
Fresh water (on site)
2
Compressed air (on site)
3
Biological stage
4
Optimus
5
Sludge trap
6
Supply 2 - Waste water supply
7
Supply 1 - Waste water supply
8
Optimus sludge trap
9
Biological stage
10
Processed water
11
Aerator
12
Control cabinet
Operation
Note
Materials such as e.g. soldering flux, sealing hemp etc. can enter
the interior of the pipes when installing pipelines on-site. These
materials can clog the fittings attached these pipelines during the
first weeks of operation. For this reason, regularly check the func-
tion of the fresh water valve and pneumatic valve in the system
during the first few weeks and clean the valves if necessary.
Note
The waste water resulting from the cleaning of buildings (walls,
floors, containers etc.) may not be cleaned in the treatment sys-
tem. The system is not designed for processing or disposing of
this type of waste water.