![Aqua Lung SEA LV2 Technical Manual Download Page 18](http://html1.mh-extra.com/html/aqua-lung/sea-lv2/sea-lv2_technical-manual_2958564018.webp)
SEA MK / LV2 Technical Manual
18
8.
Thread the MP hose (11)
onto the inlet fitting (51). Hold
the inlet fitting with a 3/4"
thin wrench and use a 11/16"
crowfoot and inch pound
torque wrench to apply 60
in-lbs (6.8 Nm) of torque to
the MP hose fitting.
5.
Place the diaphragm (48) on top of the lever (60) inside
the box bottom (69). Make sure the edges of the diaphragm
are seated below the threads inside the box bottom. Lay the
front cover (66) on top of the diaphragm.
6.
Use the retaining ring wrench to screw the retaining ring
(65) into the box bottom (69) hand tight. Place the hard cover
(64) over the front cover (66) and screw down until hand tight.
7.
Install mouthpiece (70)
onto the box bottom (69).
Loosely fasten the clamp
strap (50) over the groove at
the base of the mouthpiece.
Position the clamp strap tab
on the MP hose side of the
mouthpiece. Pull the clamp
strap tight and trim the excess
strap using diagonal pliers.
Ensure the excess strap has
been cut so it is flush with the
tab on the clamp strap.
NOTE: The LV2 mouthpiece can be adjusted to several
different user preferred positions.
(Reference the User's
Manual for more information).