background image

Working Standard WS 2320 

Quick Guide 

 

 

WS2320-QG44-EN

  

www.appliedp.com

 

1. 

How to … 

1.1 Accessories 

There are 6 connectors in Working Standard (WS) body, located top and bottom. 
These options divide all accessories into 4 categories: 

Charging (connector: +12V) 

device is battery operated, which means that after any work the WS should be charged 

Communication (connectors: USB, RS-232) 

WS measures and stores all data, each meters is saved in internal database. This data can be 
downloaded into master PC 

Measurement of power variables (connectors: In A, In B) 

Device  can  measure  wide  spectrum  of  electrical  variables  such  as  voltage,  current,  angles, 
power  factor,  powers,  energies,  ratios,    …  and  for  that  purpose  various  combinations  of 
current and voltage probes ca be used.  

Error measurement and signal output (connector: Aux) 

Optical  scanner  provides  meter’s  LED  capturing  and  disk  revolution  gathering.  On  the  other 
hand WS can be easily checked by other reference meter using proportional frequency output.  

 

1.2 Measurement and Testing 

Measurement  is  carried  out  in  real  time.  There  are  several  screens  available  right  after  device  is 
turned on. The number of screens is influenced by connected probes.  
For testing voltage, current and optical sensor is needed. For disk meter calibration is also  required in 
advance. Any test results can be saved in the database.  
 

1.3 How to start 

Situation:  Connection  system:  3P4W,  electronic  meter,  WS  probes  are  connected  right  next  to  the 
meters so WS measures exactly the same variables as the meter does. See chapter 5.1 to verify the 
connection and WS screens.  
 
Connect one voltage and one current probe to WS body (while the body is turned off). Connect also 
the optical sensor. Turn on the WS. Go to the internal database and define new meter while entering 
all values. Text fields are optional.  
Go to Meter Error Test screen. For electronic meter calibration is not necessary. Run the test. If the 
error is too far from the limit, check the optical sensor position on the meter face. Run test again or 
such many times you require and save any of them to the internal memory.  
You can addition perform energy tests on corresponding measuring screen.  
 
For transformer tests check chapters within chapter 5.  
 

Summary of Contents for WS 2320

Page 1: ...Working Standard Model WS 2320 Quick Guide Version 4 4 ...

Page 2: ...nd Testing Measurement is carried out in real time There are several screens available right after device is turned on The number of screens is influenced by connected probes For testing voltage current and optical sensor is needed For disk meter calibration is also required in advance Any test results can be saved in the database 1 3 How to start Situation Connection system 3P4W electronic meter ...

Page 3: ...Working Standard WS 2320 Quick Guide www appliedp com WS2320 QG44 EN 3 2 Accessories ...

Page 4: ...urrent Phase Distortion Factor of Voltage Distortion Factor of Current Active Power of Higher Harmonics f Frequency L1xx Phase Sequence L123 or L132 ΣP Sum of Active Powers ΣQ Sum of Reactive Powers ΣS Sum of Apparent Powers EP Active Energy EQ Reactive Energy ES Apparent Energy ΣEP Sum of Active Energies ΣEQ Sum of Reactive Energies ΣES Sum of Apparent Energies CT Current Transformer PT Voltage T...

Page 5: ...Working Standard WS 2320 Quick Guide www appliedp com WS2320 QG44 EN 5 4 Testing ...

Page 6: ...Working Standard WS 2320 Quick Guide WS2320 QG44 EN www appliedp com 6 5 Connection Examples 5 1 WS on Secondary Side 3P4W Basic Screens Cyclically F1 F3 from Harmonics screen ...

Page 7: ...ck Guide www appliedp com WS2320 QG44 EN 7 Cyclically button right opposite direction by left button Once button down and then right button several times Cyclically button down Other noticeable screens Meter Definition in Database ...

Page 8: ...Working Standard WS 2320 Quick Guide WS2320 QG44 EN www appliedp com 8 5 2 WS on Primary Side 1P2W Rogovski Coil Basic Screens ...

Page 9: ...Working Standard WS 2320 Quick Guide www appliedp com WS2320 QG44 EN 9 Other noticeable screens Meter Definition in Database ...

Page 10: ...Working Standard WS 2320 Quick Guide WS2320 QG44 EN www appliedp com 10 5 3 WS on Secondary Side 1P2W Basic Screens ...

Page 11: ...Working Standard WS 2320 Quick Guide www appliedp com WS2320 QG44 EN 11 Other noticeable screens Meter Definition in Database ...

Page 12: ...Working Standard WS 2320 Quick Guide WS2320 QG44 EN www appliedp com 12 5 4 Current Transformer one 3f probe no Voltage Default Screen ...

Page 13: ...Working Standard WS 2320 Quick Guide www appliedp com WS2320 QG44 EN 13 5 5 Current Transformer two 3f probes no Voltage Default Screen ...

Page 14: ...Working Standard WS 2320 Quick Guide WS2320 QG44 EN www appliedp com 14 6 Database of Meters and Test Results ...

Page 15: ...Working Standard WS 2320 Quick Guide www appliedp com WS2320 QG44 EN 15 7 Menu ...

Page 16: ...e Step 3 Communication Parameters Setting Start the program ws exe Select menu item Configuration Parameters from the main program window Fig 1 for displaying communication parameters settings window Fig 2 Select correct port to which the device is connected and communication speed same as is set in device Fig 1 Main program window Fig 2 Communication parameters settings window Step 4 Measured Dat...

Page 17: ...17 9 Optical Scanner Positioning Positioning on dynamic disc meter Cover glass Meter disc False reflection from the glass LED Detector Capturing range of the scanner Real reflection from the disc Positioning on static electronic meter Detector Cover glass Transmitter LED ...

Reviews: