![Apec Water ESSENCE ROES-PHUV75 Installation Instructions & Owner'S Manual Download Page 21](http://html1.mh-extra.com/html/apec-water/essence-roes-phuv75/essence-roes-phuv75_installation-instructions-and-owners-manual_2952292021.webp)
18
Yellow Tubing
to Tank
Clear Tubing
to Faucet
Red Tubing
from
Water Source
G
F
3.
Wait for tank to fill:
Before usage, allow the tank to fill. Tank normally takes
2-3 hours
to fill.
When the tank is filled, the RO will shut off automatically.
4.
Drain Tank:
Please do not use the first tank of water. Once the tank has filled, open
the drinking water faucet to drain the tank and filters.
It will usually take
about 5 minutes to flush the unit. When the tank is completely empty water will
simply trickle out the faucet. At this time, please close the drinking faucet and allow
the unit another 2-3 hours to refill the tank. The 2nd tank of water will be ready for
use.
Please Note:
Water may come out dark for the first few seconds on the initial
flush, and then clear right up. This is due to the GAC (granular activated carbon)
post filter.
5.
Clean up area:
Allow the system to run while cleaning up tools and work area.
6.
Check for leaks!
Make sure
no leaking
at joints, fittings, valves, and tubing connections.
Congratulations! You have successfully installed the Reverse Osmosis System!
* * * End Installation Section * * *
Step 7: System Start-Up
1.
Turn on feed water:
Slowly, turn on your Cold water supply. Open the Needle Valve (turn
counter-
clockwise
) to allow the raw water to enter the system.
Check for leaks!
2.
Open tank valve:
Open the tank’s ball valve to allow water to enter the tank. The tank’s valve is
“On”
when the valve handle is parallel (in the same direction) with the valve’s outlet (
see Fig. 12
).
Check for leaks!
3.
UV Light
: Please attach the UV Transformer to the UV light, then to power outlet. The UV light
indicator will illuminate once the UV unit is powered.
18
Ye
Ye
Y
Ye
ll
llow
llow Tubing
Tubing
to Tank
Clear Tubing
tto F
Fa
t
ucet
Red Tubing
from
Water Source
G
F
3.
Wait for tank to fill:
Before usage, allow the tank to fill. Tank normally takes
2-3 hours
to fill.
When the tank is filled, the RO will shut off automatica
a
ll
lly.
y.
4.
Drai
i
n
n
Ta
T
nk:
Please do not use the firs
s
t
t ta
tank
nk
of water. Once the tank has f
f
il
il
le
le
d,
d
open
, p
the drinking water fauce
ce
t
t
to
to
drain the tank and filters.
g
It wi
w
ll
ll
u
u
su
sually take
about 5 minutes to flu
u
sh
sh t
the
he
unit. When the tank is completely
y
e
e
mp
mp
ty water will
simply trickle out the
e
f
fau
au
ce
c
t. At this time, please close the dr
dr
in
inki
ki
n
ng faucet and allow
the unit another
r
2
2-3
-3 h
h
ou
rs to refill the tank. The 2nd tan
nk
k of
of
water will be ready for
use.
Plea
a
se
se
N
N
ot
te
e:
Water may come out dark for
th
the
e
fi
fi
rs
rs
t
t
few seconds on the initial
flus
sh,
h,
a
a
nd
nd
then clear right up. This is due to the
he
G
G
AC
AC
(granular activated carbon)
post
st
f
fil
ilte
ter
r.rr
5.
Clean up area:
Allow the system to run while cleaning up tools and work area.
6.
Check for leaks!
Make sure
no leaking
at joints, fittings, valves, and tubing connection
ns.
s.
Congratulations! You have su
ucc
cc
es
essf
sf
ully installed the Reverse Osmos
os
is
i
S
S
ys
ys
tem!
*
* *
*
*
*
End Installation Section * * *
Step 7: Sys
yste
te
m
m Start-Up
1.
Tu
u
rn
r o
o
n
n feed water:
Slowly, turn on your C
C
ol
ol
d
d
water supply. Open the Needle Va
V
lve
e
(t
(t
urn
yy
counter-
cl
cl
oc
c
kw
k
ise
) to allow the raw water to enter
th
th
e
e
sy
stem.
Check for leaks!
2.
2
O
Open tank valve:
Open the tank’
k’s
s
ba
ba
ll
ll
v
v
alve to allow water to enter the tank.
k T
T
h
he tank’s valve is
“On”
when the valve handle is par
al
al
le
le
l
l (in the same direction) with the valve’s outlet (
see Fig. 12
).
Check for leaks!
3.
UV Light
: Please attach the UV Transformer to the UV light, then to power outlet. The UV light
indicator will illuminate once the UV unit is powered.