AOM EAN Specifications Download Page 12

 

 

 
 

AOM

 

AUSTRALIA

 

21/54

 

Beach

 

Street

 

Kogarah

 

NSW

 

2217

     

Tel

 

Sales

 

1300

 

903

 

788

     

Service

 

1300

 

904

 

088

 

www.aomaus.com.au

    

email

 

[email protected]

 

rev

 

1,

 

22/09/2016

 

 

 

 

12

 

 
 
 

7.1.4

 

Building

 

Code

 

of

 

Australia

 

guidelines

 

should

 

be

 

followed

 

for

 

all

 

hanging

 

and

 

supporting

 

of

 

the

 

equipment.

 

7.2

 

Delivery

 

and

 

handover

 

 

7.2.1

 

Delivery

 

of

 

the

 

equipment

 

will

 

be

 

completed

 

once

 

the

 

full

 

invoiced

 

amount

 

has

 

been

 

received

 

by

 

AOM.

    

7.2.2

 

Delivery

 

of

 

the

 

equipment

 

will

 

be

 

completed

 

to

 

the

 

address

 

as

 

indicated

 

by

 

the

 

Client

 

and

 

by

 

means

 

of

 

the

 

agreed

 

logistics.

  

7.2.3

 

Unless

 

the

 

client

 

requests

 

otherwise,

 

the

 

delivery

 

will

 

be

 

ensured

 

to

 

the

 

closest

 

suitable

 

access

 

point,

 

at

 

which

 

point

 

the

 

handover

 

of

 

the

 

equipment

 

is

 

complete.

  

7.2.4

 

Alternatively,

 

the

 

client

 

can

 

organise

 

to

 

have

 

the

 

product

 

picked

 

up

 

at

 

an

 

AOM

 

warehouse,

 

at

 

which

 

point,

 

hand

 

over

 

is

 

completed.

  

7.2.5

 

Unless

 

otherwise

 

mentioned,

 

cost

 

of

 

delivery

 

including

 

freight

 

and

 

any

 

additional

 

handling

 

costs

 

(including

 

crating),

 

are

 

not

 

included

 

in

 

the

 

AOM

 

quoted

 

price

 

and

 

will

 

need

 

to

 

be

 

organised

 

once

 

a

 

delivery

 

address

 

is

 

provided.

  

7.2.6

 

The

 

equipment

 

will

 

be

 

delivered

 

at

 

the

 

agreed

 

delivery

 

date

 

and

 

following

 

on

 

from

 

AOM

 

Australia

 

quality

 

control

 

testing

 

on

 

the

 

equipment.

  

7.3

 

Receiving

 

 

7.3.1

 

Upon

 

receiving

 

the

 

product,

 

check

 

to

 

ensure

 

all

 

items

 

are

 

accounted

 

for

 

by

 

referencing

 

the

 

delivery

 

receipt

 

or

 

packing

 

list.

 

7.3.2

 

Inspect

 

each

 

crate

 

or

 

carton

 

for

 

shipping

 

damage

 

before

 

accepting

 

delivery.

 

Alert

 

the

 

carrier

 

of

 

any

 

damage

 

detected.

 

The

 

customer

 

will

 

make

 

a

 

notation

 

of

 

damage

 

(or

 

shortage

 

of

 

items)

 

on

 

the

 

delivery

 

receipt

 

and

 

all

 

copies

 

of

 

the

 

bill

 

of

 

lading

 

which

 

is

 

countersigned

 

by

 

the

 

delivering

 

carrier.

 

7.3.3

 

If

 

damaged,

 

immediately

 

contact

 

your

 

AOM

 

Representative.

 

Any

 

physical

 

damage

 

to

 

the

 

Electostatic

 

Precipitator

 

after

 

acceptance

 

is

 

not

 

the

 

responsibility

 

of

 

AOM.

 

7.4

 

Unpacking

 

 

7.4.1

 

Verify

 

that

 

all

 

required

 

parts

 

and

 

the

 

correct

 

quantity

 

of

 

each

 

item

 

have

 

been

 

received.

 

7.4.2

 

If

 

any

 

items

 

are

 

missing,

 

report

 

shortages

 

to

 

your

 

local

 

Representative

 

to

 

arrange

 

for

 

obtaining

 

missing

 

parts.

  

7.4.3

 

Confirmation

 

of

 

shipment(s)

 

must

 

be

 

limited

 

to

 

only

 

items

 

on

 

the

 

packing

 

list.

 

7.5

 

Storage

 

 

7.5.1

 

Units

 

are

 

protected

 

against

 

damage

 

during

 

shipment.

 

If

 

the

 

unit

 

cannot

 

be

 

installed

 

and

 

operated

 

immediately,

 

precaution

 

needs

 

to

 

be

 

taken

 

to

 

prevent

 

deterioration

 

of

 

the

 

unit

 

during

 

storage.

 

7.5.2

 

The

 

user

 

assumes

 

responsibility

 

of

 

the

 

unit

 

and

 

accessories

 

while

 

in

 

storage.

 

AOM

 

will

 

not

 

be

 

responsible

 

for

 

damages

 

during

 

storage.

 

7.5.3

 

The

 

ideal

 

environment

 

for

 

storage

 

of

 

the

 

Electrostatic

 

Precipitator

 

is

 

indoors,

 

above

 

grade,

 

in

 

a

 

clean,

 

dry

 

atmosphere

 

that

 

is

 

sealed

 

from

 

the

 

elements.

 

While

 

in

 

storage,

 

inspect

 

the

 

equipment

 

routinely

 

and

 

eliminate

 

any

 

possible

 

sources

 

of

 

moisture,

 

dirt

 

or

 

other

 

accumulations.

 

 
 
 
 
 

Summary of Contents for EAN

Page 1: ...7 INSTALLATION GUIDELINES 11 7 1 General 11 7 2 Delivery and handover 12 7 3 Receiving 12 7 4 Unpacking 12 7 5 Storage 12 7 6 Installation scenarios 13 7 7 Installation 13 7 8 Access requirements 14 7...

Page 2: ...out Australia and New Zealand Please contact your AOM representative for project examples The EAN models available are EAN 200 EAN 400 EAN 600 EAN 660 T EAN 800 and EAN 1200 More detailed specificatio...

Page 3: ...1340 W x 480 H Number of cells mm 1 cell 1 cell 2 cells 3 cells Size of cells mm 470 L x 325 W x 465 H 300 L x 700 W x 455 H 470 L x 325 W x 465 H 470 L x 325 W x 465 H Housing Material Powder Coated...

Page 4: ...AOM AUSTRALIA 21 54 Beach Street Kogarah NSW 2217 Tel Sales 1300 903 788 Service 1300 904 088 www aomaus com au email info aomaus com au rev 1 22 09 2016 4 3 DIMENSIONS 3 1 EAN 200...

Page 5: ...AOM AUSTRALIA 21 54 Beach Street Kogarah NSW 2217 Tel Sales 1300 903 788 Service 1300 904 088 www aomaus com au email info aomaus com au rev 1 22 09 2016 5 3 2 EAN 300...

Page 6: ...AOM AUSTRALIA 21 54 Beach Street Kogarah NSW 2217 Tel Sales 1300 903 788 Service 1300 904 088 www aomaus com au email info aomaus com au rev 1 22 09 2016 6 3 3 EAN400...

Page 7: ...AOM AUSTRALIA 21 54 Beach Street Kogarah NSW 2217 Tel Sales 1300 903 788 Service 1300 904 088 www aomaus com au email info aomaus com au rev 1 22 09 2016 7 3 4 EAN600...

Page 8: ...AOM AUSTRALIA 21 54 Beach Street Kogarah NSW 2217 Tel Sales 1300 903 788 Service 1300 904 088 www aomaus com au email info aomaus com au rev 1 22 09 2016 8 4 COMPONENTS 4 1 1 Schematic diagrams...

Page 9: ...comb Filters which have been tested to meet the requirements of AS1668 2 2012 section E5 regarding not deemed combustible material in accordance with section AS1530 1 The filters have also been tested...

Page 10: ...eceived by the unit o Amperemeter indicating the consumed amperage of the unit see below for the recommended amperage values o ON OFF switch and indicator lights Green LED light indicates unit is on R...

Page 11: ...al Protection Bureau standard Testing was carried out on Chinese cooking type oil smoke as a testing sample at different speeds through the filter equivalent to a heavy Type 4 cooking Filtration effic...

Page 12: ...ms are accounted for by referencing the delivery receipt or packing list 7 3 2 Inspect each crate or carton for shipping damage before accepting delivery Alert the carrier of any damage detected The c...

Page 13: ...Electrostatic Precipitator will ensure high efficiency filtration of smoke and grease particles To maximise the unit s capacity it is recommended to place the units as close as possible to the kitche...

Page 14: ...haust fan is running 7 7 10 The EAN ESP unit can be installed outside on roof tops along outside duct runs etc however the unit s electrical console needs to be covered by a weather proof box 7 8 Acce...

Page 15: ...e that a safe working platform can be installed in order to service the units 7 8 9 EAN ESP unit installed in a plant room An access path from the plantroom entry point to the EAN ESP unit door of a m...

Page 16: ...m test prior to dispatch of the equipment meaning that the EAN ESP unit can be plugged in and used immediately 7 12 Powering the unit ON 7 12 1 Press the switch ON OFF to ON The red LED light will swi...

Page 17: ...chase if an AOM cleaning contract is signed It is essential that the end user be made aware of this requirement 8 2 1 Cleaning and periodic maintenance is vital to ensure optimal performance of the AO...

Page 18: ...PCB which is faulty and needs to be replaced Problem The EAN ESP unit powers ON but the amperage fluctuates and does not settle to a fixed amount Has the unit been properly cleaned and or is the red L...

Page 19: ...date of dispatch 9 1 5 A spare part is warranted to be free from defects and or workmanship for a period of ninety 90 days from the date of dispatch 9 1 6 If a client is not able to prove that the equ...

Page 20: ...tic cells for cleaning 1 7 Remove the grease tray Discharge grease into the available grease trap Clean and replace the grease tray 1 8 Clean the cell guides throughout the whole EAN unit where the el...

Reviews: