Model 32L31F\32L41F
Document No.
ITBC0216
Version
v5.0
Panel K320WD1 series
Effective from
2012-11-1
Date Updated
2012-11-1
NO
Amount
Diagram
Tool Parameters
1
Figure 1
2
3
4
5
Prepared by
Reviewed by Approved by
Xu Sijun
Figure:
Project Controlled Seal
Recent
Modification
Record
Notice
1. Wastes produced by this station shall be placed in the assigned position. Refer to
Waste Classification and Disposal List
.
2. Install screws by the serial number (install one by one) and abnormalities such as screws being neglected, tilted and slipped are not allowed.
Part Number
Descriptions
Operations and Requirements
Station Name
Process Inspection-2
Check if all processes for each parts in the machine comply with the
requirements of operating instructions.
When finished, step on the switch with your foot to send the product to
next station.
Section/Serial No. Unit Assembly 16
Please read and understand the
operating instructions carefully
Take only
one screw
at a time
16
K320WD-LA280
Process Inspection Requirements:
1. Connection wires being missed to insert, misplaced, inserted reversely or inserted not in
place are not allowed and also do not touch high-power components such as power board and
mainboard.
2. Screws can not be missed to install, tilted or made loose; do not drop any screw into PCB
board or power board.
3. Keyboard not locked into place or keys hard to be pressed is not allowed.
4. Viscose paper must be attached in the shape of
“Ω”
, without edges and corners curling up.
5. Connection wires in the machine must be strictly arranged according to the process
requirements and keep all wires away from transformer and cushion.
6. Is the connection wire properly inserted into power switch?
7. Make sure no any sundries are left in the machine.
8. Do not change the process and plan at will.
9. Make sure no abnormalities occurs in the machine.
Figure 1
Summary of Contents for LE32W234DL
Page 32: ...Operation Instructions ...