background image

ANZZI

®

Item: SD-AZFL06001 

** 

ANZZI GLASS SHOWER DOOR 

INSTALL  &  OPERATION MANUAL 

V1 .

3

 

DON'T WAIT! 

REGISTER NOW! 

Register your product within 90 days to ensure your product is 

recognized as an official purchase and is eligible for warranty 

coverage. 

Mail in the completed registry card (Pg. 2) or register online 

at 

www.swcorp.com/register

Summary of Contents for SD-AZFL06001 Series

Page 1: ...TION MANUAL V1 3 DON TWAIT REGISTER NOW Register your product within 90 days to ensure your product is recognized as an official purchase and is eligible for warranty coverage Mail in the completed re...

Page 2: ...oncard below Byreturningthisregistration cardweconfirmthedateofpurchaseforyournewproduct Thisconfirmationwillallow ustoprocessanywarrantyclaims Mail the card to 5701 NW 35 Avenue Miami FL 33142 1 CUT...

Page 3: ...rface level radius corners or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installati...

Page 4: ...material with any questions regarding the drilling of holes into their product Tools Required 1 ii I This product is heavy and 05 16 I Philips Tape may require two people to Level Drill 8mm Knife Scre...

Page 5: ...Left hand door installation shown Right hand door installation shown...

Page 6: ...DIMENSIONS 34 864mm 0 0 74 1880mm 0 4...

Page 7: ...5 PARTS Ol Plastic anchor X6 Q llill 1111 11 C C 02 5crew STSX40mm 1 9 16 X6 03 Vertical Rail Xl 04 Vertical Rail Seal Strip Xl C C OS Fixed Panel Xl 06 Bottom Rail Xl 07 Bottom Rail Seal Strip Xl...

Page 8: ...ll Jamb Seal 1 OS Fixed Panel 1 06 Bottom Rail 1 07 Bottom Rail Seal 1 02 03 _JQ_2 GLASS THICKNESS 10mm 3 8 NOTE INSTALLATION MUST BE DONE BY A QUALIFIED LICENSED PROFESSIONAL ATTENTION e To avoid per...

Page 9: ...to the intended position Make sure the Wall Jamb 03 is resting on the floor or base and is level The end that should be resting on the floor has a 45 angle Mark the center of the holes on the wall for...

Page 10: ...Jamb 03 Both Wall Jamb 03 and Bottom Rail 06 have a 45 angle to ensure a perfect connection Make sure their edges match Measure the distance from each end of Bottom Rail 06 to the back wall to be sure...

Page 11: ...d a rubber mallet can be used to insert Wall Plugs 0l 3 To reduce risk of property damage the use of metal hammers is not recommended If needed use drill to slightly enlarge the opening of the hole IM...

Page 12: ...the Wall Jamb Seal 04 to the Fixed Panel OS The top end ofthe Wall Jamb Seal 04 should meet the top ofthe glass The bottom end should leave a gap of 10mm from the bottom ofthe glass Step 8 1 Install t...

Page 13: ...unami Guard coated side of the glass panel should face into the shower while the uncoated side faces out of the shower The Fixed Panel S has a sticker s indicating which side should face in and out St...

Page 14: ...Silicone Sealant on the Wall Jamb 03 and Bottom Rail 06 along the bottom profile and wall profiles Fig 11 3 5 The sealant should be applied to the interior edge 8 I 24 hours I Allow 24 hours for silic...

Page 15: ...use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally used rinse the surface as soon as possible to prevent damage to the finish pe...

Page 16: ...ANZZI...

Reviews: