background image

6

 

 

 
 
 

Waterproof Drywall to the 

top of the tile flange 

Caulk 

Finished wall overlaps the 

dry wall and tile flange 

Stud

 

Drywall

Side View 

1/8” 

gap  

Base

 

Apply a bead of sealant between the apron 
and finished floor and wait for 24 hours 
before using the shower. (Fig.8)

STEP 8

Allow the mortar to completely harden before applying weight to the bottom of the shower 
tray. 
Install the Drywall above the tile flanges and secure it to the studs.
Put the tiles (or other finishing wall material) over the drywall leaving 1/8” gap between the 
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.7)

STEP 7

Fig. 7

Fig. 8

2

3

Summary of Contents for Anzzi SB-AZ009W

Page 1: ...DON T WAIT REGISTER NOW Register your product within 90 days to ensure your product is recognized as an official purchase and is eligible for warranly coverage Mail in the completed registry card Pg...

Page 2: ...urningthisregistration card we confirm the date of purchase for your new product This confirmation will allow us to process any warranty claims Mail the card to 5701 NW 35 Avenue Miami FL 33142 Produc...

Page 3: ...Manufacturer assumes no responsibility for product failure due to improper installation Confirm that your model will fit in intended location and plumbing fixtures are located where required before be...

Page 4: ...owel Driver Bit for use with extension bit holder Drill Bit 3 16 5 mm Extension Bit Holder Pencil Screws 8 x 1 1 2 zinc or stainless panhead or roundhead Tape Measure Shims Drop Cloth Sealant 2 tubes...

Page 5: ...These marks are used to verify base location after drain is installed Fig 1 The pipe height A shall be determined according to the products on hand Place the tray into the designated position so that...

Page 6: ...ge base Use an extended bit holder to reduce risk of drill chuck hitting base STEP 3 Fig 4 Install the shower drain NOT INCLUDED according to the drain installation manual supplied with the drain Fig...

Page 7: ...ure for 24 hours Proceed to the next step Fig 5 STEP 5 It is recommended not to stand in base while securing to wall Set base in corner and press it into mortar Secure flanges to all studs with 8 1 1...

Page 8: ...ait for 24 hours before using the shower Fig 8 STEP 8 Allow the mortar to completely harden before applying weight to the bottom of the shower tray Install the Drywall above the tile flanges and secur...

Page 9: ...nstallation instructions and the height of the Shower Tray Mark unit position on floor and through drain opening Mark the locations of the studs on the flange of the base These marks are used to verif...

Page 10: ...of the tile flange If the subfloor is not flat and level use leveling compound or mortar bed to ensure that the base is level shown in Step 5 Fig 2 STEP 2 Drill 3 16 holes at all stud locations on top...

Page 11: ...causing cracks and potential property damage DO NOT use plumber s putty to seal between drain and base Use sealant or gasket STEP 4 ATTENTION Fig 5 Apply a generous amount of mortar that has been mixe...

Page 12: ...screws through previously drilled holes Fig 6 IMPORTANT Gaps between flanges and studs must be less than 1 8 Insert shims to fill gaps if needed STEP 6 Allow the mortar to completely harden before app...

Page 13: ...ce To ensure long lasting life for your acrylic shower tray wipe them off after each use with a soft cloth To clean the acrylic shower tray use non abrasive sprays or cream based cleaners Never use ab...

Page 14: ......

Reviews: