background image

INSTALLATION GUIDE

BEFORE YOU BEGIN

Prior to installation, examine all boxes and packages for shipping damage. If the unit has been 

damaged, has a finishing defect, or has missing parts, please contact our customer support 

department within 5 business days of the delivery date. Please note that we will not replace any 

damaged products or missing parts free of charge after 10 business days or if the product has 

been installed.

These instructions include suggestions for rough construction and plumbing installation. Local 
building codes vary and could supersede those suggestions. If you are not confident in your 
ability to perform these tasks, contract out those tasks you need help with or use a professional 
installer.

Failure to read these instructions prior to installation may result in personal injury, property 
damage, or product failure. Manufacturer assumes no responsibility for product failure due to 
improper installation.

Confirm that your model will fit in intended location and plumbing fixtures are located where 
required before beginning installation. Do not install in areas where temperature may drop 
below 32ºF (0ºC).

Walls and sub-floor must be solid, plumb, and square.

Use drop cloth to protect shower base from damage during installation.

Allow product to reach room temperature for 30 minutes before installation.

Drain cutout 5” diameter max. 

IF INSTALLING MATCHING ENCLOSURE, refer to Enclosure Installation Manual for specific 
lumber sizes and placement. Additional studs will be required and need to be installed at this 
point.

Check the corresponding specification drawings for the detail dimensions.

Do not use plumber’s putty. May result in product failure. Use latex/acrylic sealant or a gasket. 

IMPORTANT: Dimensions provided are for reference only. You must measure the actual 
shower tray sizes before installation, this includes overall dimensions and drain location.

1

Summary of Contents for Anzzi SB-AZ009W

Page 1: ...DON T WAIT REGISTER NOW Register your product within 90 days to ensure your product is recognized as an official purchase and is eligible for warranly coverage Mail in the completed registry card Pg...

Page 2: ...urningthisregistration card we confirm the date of purchase for your new product This confirmation will allow us to process any warranty claims Mail the card to 5701 NW 35 Avenue Miami FL 33142 Produc...

Page 3: ...Manufacturer assumes no responsibility for product failure due to improper installation Confirm that your model will fit in intended location and plumbing fixtures are located where required before be...

Page 4: ...owel Driver Bit for use with extension bit holder Drill Bit 3 16 5 mm Extension Bit Holder Pencil Screws 8 x 1 1 2 zinc or stainless panhead or roundhead Tape Measure Shims Drop Cloth Sealant 2 tubes...

Page 5: ...These marks are used to verify base location after drain is installed Fig 1 The pipe height A shall be determined according to the products on hand Place the tray into the designated position so that...

Page 6: ...ge base Use an extended bit holder to reduce risk of drill chuck hitting base STEP 3 Fig 4 Install the shower drain NOT INCLUDED according to the drain installation manual supplied with the drain Fig...

Page 7: ...ure for 24 hours Proceed to the next step Fig 5 STEP 5 It is recommended not to stand in base while securing to wall Set base in corner and press it into mortar Secure flanges to all studs with 8 1 1...

Page 8: ...ait for 24 hours before using the shower Fig 8 STEP 8 Allow the mortar to completely harden before applying weight to the bottom of the shower tray Install the Drywall above the tile flanges and secur...

Page 9: ...nstallation instructions and the height of the Shower Tray Mark unit position on floor and through drain opening Mark the locations of the studs on the flange of the base These marks are used to verif...

Page 10: ...of the tile flange If the subfloor is not flat and level use leveling compound or mortar bed to ensure that the base is level shown in Step 5 Fig 2 STEP 2 Drill 3 16 holes at all stud locations on top...

Page 11: ...causing cracks and potential property damage DO NOT use plumber s putty to seal between drain and base Use sealant or gasket STEP 4 ATTENTION Fig 5 Apply a generous amount of mortar that has been mixe...

Page 12: ...screws through previously drilled holes Fig 6 IMPORTANT Gaps between flanges and studs must be less than 1 8 Insert shims to fill gaps if needed STEP 6 Allow the mortar to completely harden before app...

Page 13: ...ce To ensure long lasting life for your acrylic shower tray wipe them off after each use with a soft cloth To clean the acrylic shower tray use non abrasive sprays or cream based cleaners Never use ab...

Page 14: ......

Reviews: