
16 User manual OR 100 /110, ed. 5
specifications as described in the section operating environment.
Fig. 3. Lift instruction OR 100 organiser rack (left side) and OR 110 (right-
side).
Installation of OR 100
The installation procedure of the OR 100 consists of the following steps:
1. Remove the aluminium covers in front of the pulse damper and degas-
ser to avoid scratches on pump and controller during installation. Gen-
tly pull on the covers until they release (snap-in connectors).
2. Put the LC 100 pump into the OR 100 organiser rack with its feet into
the holes of the alignment plate as depicted in Fig. 4.
3. Stack the AC 100 acquisition controller on top of the LC 100 pump
(see Fig. 5.).
Fig. 4. Stacking LC 100 pump on OR 100 organiser rack.