12
Industrial Wireless Access Point
Hardware User's Manual
– AMS-2111
4. Hardware Installation
4.1 Installation Steps
This section will explain how to install Antaira
Technologies’ AMS-2111 series.
Caution:
1.
This device is intended for indoor use and at altitudes up to 2000 meters.
2.
This device is intended to be installed in an industrial control enclosure and panel.
Installation Steps
1. Unpack the industrial wireless AP from the original packing box.
2. Check if the DIN
‐
Rail bracket is screwed on the industrial wireless AP.
a. If the DIN
‐
Rail is not screwed on the industrial wireless AP, please refer to the
DIN
‐
Rail
Mounting
section for DIN
‐
Rail installation.
b. For wall mounting, please refer to the
Wall Mounting
section for wall mounting
installation.
3. For DIN
‐
Rail or wall mounting, please refer to the
Mounting Installation
section.
4. Power on the industrial wireless AP, then the power LED light will turn on.
a. For wiring power, please refer to the
Wiring the Power Inputs
section.
b. Please refer to the
LED Indicators
section for LED light indication.
5. Prepare the twisted
‐
pair, straight
‐
through category 5 cable for Ethernet connection.
6. Insert one side of the RJ
‐
45 cable into the wireless AP
’s Ethernet port and on the other side into
the networking device’s Ethernet port, e.g. switch, PC, or server. The Ethernet port’s (RJ
‐
45)
LED on the industrial wireless AP will turn on when the cable is connected to the networking
device.
a. Please refer to the
LED Indicators
section for LED light indication information.
7. When all connections are set and the LED lights all show normal, the installation process is
complete.
4.2 Maintenance and Service
•
If the device requires servicing of any kind, the user is required to disconnect and remove it from its
mounting. The initial installation should be done in a way that makes this as convenient as possible.
•
Voltage/Power lines should be properly insulated as well as other cables. Be careful when handling
them so as to not trip over.