Installation examples
A-C: Boiler control via 0-10VDC + low loss header
36
A-C: Boiler control via 0-10VDC + low loss header
Description
•
R600 with low loss header
Tips
•
Complete accessory kits with low loss
header are available for
∆
T=10-20K
(see chapter „Accessories“).
•
The primary circuit should be de-
signed for
∆
T=20K, this guarantees a
high boiler efficiency.
•
When the secundary circuit is de-
signed for a
∆
T smaller than 20K, the
flow temperature in the header will be
lower than the flow temperature of the
boiler. This should be taken in consid-
eration during the design stage.
•
The header should be positioned
close to the boiler, to avoid a negative
influance on the temperature control
quality.
•
In case of a boiler room installed on
the roof, the boiler may never be hy-
draulically connected at the highest
point of the installation.
Summary of Contents for SH60
Page 3: ...3 ...
Page 7: ...Technical description Declaration of conformity 7 ...
Page 26: ...26 UPS32 60F UPS32 120F UPS50 120F UPS65 120F Accessories Plug play kits ...
Page 45: ......
Page 46: ......
Page 47: ......