CONNECT GAS LINE FROM GAS PRESSURE REGULATOR TO GAS SUPPLY:
1. Apply pipe-joint compound made for use with LP gas to the tapered (NPT)
threads of both adapters
d
supplied with gas line kit.
2. Attach one adapter to the gas pressure regulator and the other to the gas
shutoff valve and tighten both.
NOTE: Do Not rotate the gas pressure regulator.
3. Attach the flexible gas line
c
to adapters
d
, one adapter at each end.
IMPORTANT: All connections must be wrench tightened (requires two 10"
adjustable wrenches). Do not over-tighten the connections to the gas pressure
regulator. Overtightening may crack the regulator creating a leak.
b
c
e
a
d
d
a
Adapter (provided)
b
Gas Pressure Regulator
c
Gas Supply Line
d
Adapters (From Gas
Supply Line Kit)
e
Gas Shutoff Valve
COMPLETE CONNECTION
1. Open the manual shutoff valve in the gas supply line. The valve is open when the
handle is parallel to the gas pipe.
2. Test all connections by brushing on an approved noncorrosive leak-detection
solution. If bubbles appear, a leak is indicated. Correct any leak found.
18