Rack Mounting MAX Servers
47
MAX HT Servers
Step 6: Load the HT Server Into the Rack
Once the Rail Assemblies have been installed into the equipment rack cabinet, the server can be mounted
on the rails and slid into the rack (FIG. 49):
1.
Slide the Rails (Intermediate Sections) out to their fully extended position.
2.
Carefully align the Chassis Sections (mounted on the HT Server) with the extended Rails.
3.
Slide the server onto the extended rails.
Keep the server parallel to the floor when sliding the server
rails into the rails. Tilting the server up or down could result in damage to the Slide Rails.
4.
Carefully slide the server into the rack until the Locking Release Tabs on the Chassis Sections (in
the equipment rack) engage the Intermediate Section Rails, securing the server in place.
FIG. 49
Sliding the server chassis into the rack
Chassis Section
Intermediate Section
(fully extended)
CAUTION!
Refer to the Safety Instructions
on page one before installing
the server chassis into the
equipment rack
Equipment Rack
Summary of Contents for MAX-HT04
Page 6: ...iv MAX HT Servers Table of Contents...
Page 18: ...MAX HT Servers Setup and Configuration 12 MAX HT Servers...
Page 36: ...MAX Admin Menu 30 MAX HT Servers...
Page 42: ...MAX Servers DVD Drives Supported Formats 36 MAX HT Servers...
Page 46: ...Replacing HDDs in MAX Servers 40 MAX HT Servers...
Page 54: ...Rack Mounting MAX Servers 48 MAX HT Servers...