Step 4.
Locking Latch Cable
•
See below Release Cable Connecting Pictures
Before delivery, all the 7 safety sockets come pre-assembled. Note: number 6&7
sockets with pulley installed are not in the center position as below pic#1.
Install socket 1-5 and secure accordingly and then install number 7 socket.
Before start to install number 6 socket, make sure the hydraulic hose was
installed first and then secondly the steel cable (L=5760mm). Make sure the
socket 6 was installed with pulley parallel to socket 7 pulley, pic#2. Install
number 1 and 2 steel cable on main column and number 3 and 4 steel cables
on the second column. As steel cable number 3 is already installed from socket
6, the rest installation will be made through main column to the sheave of the
operating handle and second column, then pull the handle to open the two
locks on the main column. Pull steel cable number 3 to open the two locks on
second column to make sure all safety cables operated synchronically. Secure
the steel cable number 3 on the safety handle sheave, move hands from the
Summary of Contents for AM-TPL10F
Page 1: ...PLEASE READ THE PRODUCT MANUAL ENTIRELY BEFORE INSTALLING OR OPERATING THE LIFT ...
Page 7: ...Two Post Car Lift AM TPL10F 7 LIFT COMPONENTS ...
Page 8: ...Two Post Car Lift AM TPL10F 8 LIFT DIMENSIOINS ...
Page 18: ...Two Post Car Lift AM TPL10F 18 ...
Page 27: ...Two Post Car Lift AM TPL10F 27 EXPLODED DRAWING ...
Page 28: ...Two Post Car Lift AM TPL10F 28 ...
Page 29: ...Two Post Car Lift AM TPL10F 29 ...
Page 30: ...Two Post Car Lift AM TPL10F 30 MAINTENANCE LOG ...