14
Four post parking lift AM-FPL9
⚫
After removing the shipping racks holding the two runways
together, remove top runway out of the skid and place it on
the side.
⚫
Remove 4 posts, two cross rails, two ramps and all the other
parts off the bottom runway.
⚫
Contact us if there are any parts missing.
⚫
Please make sure you read the space, foundation and
installation requirements and anchoring guidelines
thoroughly in previous pages. The area where the lift will be
located should be free of overhead obstructions such as
heaters, building supports, electrical wires and so on. Also
make there is enough clearance around the lift for driving
vehicles getting on or off the lift.
⚫
By using a chalk, draw an outline of the base plate on the
installation ground and establish the position for all the four
posts
⚫
Double check all dimensions and make sure that the layout
is square.
Step 2.
⚫
Ascertain the side where the power unit post will be located.
Please remember this is the post where your main electrical
power supply will be connected.
⚫
Double check all dimensions and make sure that the layout
is square and aligned with the chalk line.
⚫
Lay down rear posts on the ground and remove the top plates
form top of the posts and install the Cross rail in the posts by
sliding the plastic guide blocks into the column channel. The
safety latch must be positioned in the same level from the
ground and make safety latch facing towards the outside of
the lift when you stand the columns back up. Manually hold
Summary of Contents for AM-FPL9
Page 1: ...PLEASE READ THE PRODUCT MANUAL ENTIRELY BEFORE INSTALLING OR OPERATING THE LIFT ...
Page 9: ...Four post parking lift AM FPL9 8 LIFT COMPONENTS ...
Page 10: ...Four post parking lift AM FPL9 9 LIFT DIMENSIONS ...
Page 24: ...23 Four post parking lift AM FPL9 5EXPLODED DRAWING ...
Page 25: ...24 Four post parking lift AM FPL9 ...
Page 26: ...25 Four post parking lift AM FPL9 ...
Page 27: ...26 Four post parking lift AM FPL9 MAINTENANCE LOG ...