![Ampac NZ100 Series Installation, Commissioning & Operation Download Page 3](http://html.mh-extra.com/html/ampac/nz100-series/nz100-series_installation-commissioning-and-operation_2934089003.webp)
NZ100 Installation Commissioning & Operation
CONTENTS
PAGE NO.
1.
INTRODUCTION ................................................................................................................1
1.1
Unpacking and Inspection................................................................................................. 1
1.2
Anti Static Precautions .................................................................................................... 1
2.
SPECIFICATIONS .............................................................................................................1
2.1
Power Supply/Battery Charger .......................................................................................... 1
2.2
Outputs .......................................................................................................................... 1
2.3
Detector Circuit ............................................................................................................... 1
3.
SYSTEM DESCRIPTION..................................................................................................2
3.1
General Description ......................................................................................................... 2
3.2
Front Panel Layout .......................................................................................................... 2
3.3
Internal Layout................................................................................................................. 3
3.4
Detector Circuits.............................................................................................................. 3
3.5
Bell Circuits .................................................................................................................... 4
3.6
Auxiliary Output............................................................................................................... 4
3.7
Walk Test ....................................................................................................................... 4
3.8
Buzzer............................................................................................................................ 4
3.9
Buzzer Mute ................................................................................................................... 4
3.10
Defect Indicators.............................................................................................................. 4
3.11
Power Supply.................................................................................................................. 5
3.12
Mains On Indicator........................................................................................................... 5
3.13
Fusing ............................................................................................................................ 5
3.14
Batteries ......................................................................................................................... 5
4.
CONNECTING DEVICES.................................................................................................6
4.1
Detectors ........................................................................................................................ 6
4.2
Detector Limitations ......................................................................................................... 6
4.3
Manual Call Points........................................................................................................... 6
4.4
Bells and Sounders.......................................................................................................... 8
4.5
Auxiliary Relay ................................................................................................................ 8
5.
SETTINGS...........................................................................................................................9
5.1
Gating ............................................................................................................................ 9
5.2
No Brigade Board ............................................................................................................ 9
6.
INSTALLATION AND INITIAL OPERATION ..............................................................10
6.1
Installing the NZ100 ........................................................................................................10
6.2
Initial operation ...............................................................................................................10
7.
INSTALLING THE BRIGADE BOARD (SGD TYPE II ).............................................11
8.
ASPI RELAY BOARD .....................................................................................................13
9.
SYSTEM OPERATION....................................................................................................14
9.1
Resetting the system......................................................................................................14
9.2
Using the Walk Test facility. ............................................................................................14
9.3
Evacuation. ....................................................................................................................14
10.
TROUBLESHOOTING....................................................................................................15
11.
APPENDIX ........................................................................................................................16