5

Step 5.  Assemble the 7 individual wall panels and 1 door panel 

2.

 Insert each of the balusters into 

one handrail plate.

3.

 Follow the same procedure to 

attach the other handrail plate 
and balusters together.

1.

 Each baluster should be inserted 

sideways into the appropriate 
cutout and tapped horizontally into 
place with your rubber mallet.  Tap 
the top of each baluster to securely 
seat it down into the cutout in the 
handrail plate.

6.

 

Assemble 
all seven 
individual 
wall 
panels.

7. 

In each of the 7 wall panels, connect the top and bottom handrail plates  

to the center baluster(s) by driving 2" screws into the pre-drilled holes.  
Keep 29 ¼" spacing between the plates.

Hint:

  

If you have 
the optional 
screen 
package,  
DO NOT 
install the 
angled 
braces in  
the door 
section.

5.

 Use two 2½” screws at each 

connecting point except for the 
high end of the diagonal brace 
which requires only one 2½” 
screw in the pre-drilled hole.

4. 

Next, arrange the handrail section, 

posts, braces and upper rail as shown 
below.

6

Use 2½” screws to assemble each individual wall panel.

Begin by inserting each of the handrail balusters into the handrail top and bottom plates.

Note: 

The long point of each 

post must face toward the 

inside of your gazebo so the 

roof rafters fit properly.

Note:

 For 12’ gazebos there 

will be 2 screws used. With  

an 8’ or 10’ gazebo there  

will only be 1 screw used.

Finished 
Handrail

Summary of Contents for Wood Gazebo-in-a-Box

Page 1: ...Wood Gazebo in a Box Assembly Instructions 2017 www AmishGazebos com 1 800 700 1777...

Page 2: ......

Page 3: ...try Gazebos 340 Hostetter Rd Manheim PA 17545 Customer Service Department Hours Monday Friday 8 00 am 4 00 pm and some Saturdays 10 00 am 3 00 pm Eastern Standard Time 1 800 700 1777 Ext 4 www AmishGa...

Page 4: ......

Page 5: ...rvice Department at 1 800 700 1777 Ext 4 Hours of operation are Monday Friday 8 30 am 5 00 pm and some Saturdays 10 00 am 3 00 pm Eastern Standard Time STEP 1 Gather the following tools to use for ass...

Page 6: ...ion for your gazebo 8 ft 97 3 16 89 13 16 37 3 16 10 ft 125 15 16 116 5 16 48 3 16 12 ft 144 1 8 133 1 4 55 3 16 Size A B C These dimensions are ideal to use for your foundation whether you have a gaz...

Page 7: ...s 8 pieces 8 pieces l 2x3 handrail plates 14 pieces 14 pieces 14 pieces l 1x3 balusters 35 pieces 49 pieces 56 pieces l large plywood roof panels 0 pieces 8 pieces 8 pieces l medium plywood roof panel...

Page 8: ...panel on its side and tap the underside of these floorboards to remove them from the floor panel 3 Then remove and discard the small nails from each floor board 4 After aligning your floor panels use...

Page 9: ...r is fastened together put down the sixteen floorboards that were removed earlier and the octagonal shaped floor center piece then fasten them in place using 2 screws 6 Repeat step five until all floo...

Page 10: ...riving 2 screws into the pre drilled holes Keep 29 spacing between the plates Hint If you have the optional screen package DO NOT install the angled braces in the door section 5 Use two 2 screws at ea...

Page 11: ...s at the top and bottom 2 Secure the posts using 2 screws in pre drilled holes 3 Follow the same procedure to assemble the remaining wall panels including the doorway panel Note To avoid having screws...

Page 12: ...the top of the ceiling center block and attach the two together by driving one 2 screw through the rafter 4 Install the third and fourth rafters at a 90 angle from the first two rafters 5 Now install...

Page 13: ...d and repeat this assembly process for all eight boards Note You may need to back out the screws a little bit before you attach the next board You can then retighten them all when all the boards are o...

Page 14: ...t rafter 3 Next go to the center of the plywood panel where it meets the fascia board Pull the fascia board out slightly to properly align it then drive one 2 screw through the plywood and into the fa...

Page 15: ...sts to concrete you will need to purchase concrete screws to secure your post bottoms to your foundation 2 The vertical seams in the middle of each post should be positioned directly over the floorboa...

Page 16: ...d rafter meet on the inside of the gazebo 5 Then run the wires of the electrical package trim strip through these holes The long wire at the top goes through the rafter and the short wire goes through...

Page 17: ...plywood roof panel where the rafters meet the ceiling center block The hole should be right beside the ceiling center block and between two rafters Run the wire down through this hole into the gazebo...

Page 18: ...past the roof edge 3 Attaching the starter shingles With four or five 3 4 nails placed along a line parallel to and 2 above the roof edge Starter shingles should then be installed around the entire p...

Page 19: ...m the end of the shingle below it 5 Attach with five 3 4 nails at the center line marked on the shingle Do not fasten below the white line or your nail will be exposed 8 Follow the same procedure to t...

Page 20: ...ace the first ridge cap shingle at the bottom edge of your roof ridge so that the black tar area of the shingle is very near the roof edge Ridge caps need to be centered over the roof seam 3 Secure th...

Page 21: ...e second shingle directly on top of the first shingle that you installed and secure this shingle with one roofing nail on each side 6 Apply the remaining ridge cap shingles with a 5 5 8 exposure and s...

Page 22: ...shingles to create your 8 large and 8 small shingles 2 Nail the 8 large shingle pieces to the cupola first Then apply the 8 small pieces as shown below Keep the nails close to the edge of the shingle...

Page 23: ...inless steel staple 5 After you apply shingles to the cupola you can secure it to your gazebo roof using four 2 screws Finally insert the designer finial into the top of the cupola This finial does no...

Page 24: ...ectly on the angled strips Fasten these with the 2 screws through the pre drilled holes Likewise attach the horizontal 1 3 8 x 2 board to the bottom of header board making sure they line up with each...

Page 25: ...ling the benches optional 21 5 Confirm that the seat boards remain in their proper position then attach each seat board to the bench support board by driving screws up through the bench support board...

Page 26: ......

Page 27: ......

Page 28: ...www AmishGazebos com 1 800 700 1777...

Reviews: