Pneumatics
➢
Install a
lockable
main cut-off switch,
featured with a pressure release mechanism,
on the compressed air supply line close to
the control panel.
➢
If the control panel is installed far away and there is no eye contact with the filter, a
lockable
compressed air cut-off switch,
featured with a pressure release mechanism,
should be installed near each filter unit.
➢
The user should make sure that the compressed air supplied to the filter never exceeds the maximum designated pressure for
this filter. An air-pressure reduction valve should be i
nstalled on the compressed air supply line upstream of the filter’s pneumatic
inlet port.
Hydraulics
➢
Extra safety devices should be installed on hot water applications to avoid skin burn danger.
➢
The user should install a manual Water Cut-off Valve next
to the filter’s inlet port.
➢
In cases where the downstream piping network downstream of the filter is pressurized an additional manual Water Cut-off Valve
should be installed next to the filter outlet port.
➢
The user should make sure that the system includes a Pressure Release / Drainage Valve to enable release of residual pressure
prior to any maintenance procedure performed on the filter.
➢
The user should make sure that the filter is never exposed to water pressure exceeding the maximum designated pressure for this
filter, if needed a Pressure Reduction Valve should be installed upstream of the filter’s water inlet port.
➢
Please note that the maximum working pressure indicated a
t the filter’s specifications table includes the pressure caused by fluid
hammer and pressure surge effects.
Civil Engineering
➢
Make sure that the filter installation is done by Amiad qualified technicians.
➢
Make sure that any civil engineering work at the installation site such as construction, lifting, welding, etc. is done by qualified
workers / technicians / contractors and in accordance with the relevant local standards.
➢
While using lifting equipment, make sure that the filter or the lifted part is chained securely and in
a safe manner.
➢
Do not leave lifted equipment if there is no necessity. Avoid working below lifted equipment.
➢
Wear a safety helmet while using lifting equipment.
➢
Make sure that the flooring is sloped for drainage and to avoid accumulation of liquids.
Commissioning
➢
Read carefully the Commissioning and the First Start-up Operation instructions prior to any attempt to operate the filter.
➢
In order to achieve maximum performance and smooth operation of the filter it is crucial to perform the Startup and First
Operation procedures exactly as described in this manual.
➢
Commissioning the filter should be done by an authorized Amiad technician, do not attempt to commission the filter
unaccompanied since this may lead to undesired damage and may affect your warranty coverage.
Operation and Control
➢
Do not operate the filter before reading carefully and being familiar with its operation instructions.
➢
Observe the safety stickers on the filter and never perform any operation contradicting the instructions given.
➢
Never operate or use the filter for purposes other than its original design and operational envelope.