3
III. INSTALLATION STEPS
A. Check the parts before assembly, make sure all the parts are completed.
1. Packaged lift, Parts box,
Power Unit and Power Unit Stand.
Move the parts aside, open the outer packing and check the parts according to the
shipment parts list
(See Fig. 3)
.
2. Open the parts box, check the parts according to the part list
(See Fig. 4)
.
Fig. 3
Fig. 4
41
Summary of Contents for MR06
Page 1: ...Portable Mid rised Lift Model MR06...
Page 7: ...5 Install power unit and power unit fitting See Fig 7 Fig 7 30...
Page 12: ...10 IV EXPLODED VIEW Model MR06 Fig 13 9A 19 18 44 45 46 47...
Page 13: ...11 CYLINDER MANUAL POWER UNIT 220V 60HZ 1 phase Fig 14 Fig 15...
Page 20: ...18 72126710 10 2018...