3. Remove aside the top top beam assy.
(See Fig. 9).
4. Lift the upper column with a fork lift or hoist, loose the bolts of the upper package
stand, take off the upper extension column, then take out the parts in the inner column
(See Fig. 10).
5. Lift the lower column with a fork lift or hoist, take down the package stand, than take
off the lower extension column, take out the parts in the inner column
(See Fig. 11).
Fig. 9
Fig. 10
Fig. 11
Open the
package
s
Lift the lower column
with a fork lift or hoist