
11
23
22
21
27
Note:
Minimum embedment of Anchors is
5 7/8”(150mm)
.
H. Install overhead top beam
1. With help of the hook of top beam, put one side of top beam on top of the extension
column and connecting the top beam to extension column by bolts, tighten the bolts.
Then assemble the connecting bracket
(See Fig. 21)
.
Fig.
21
Hook on to the
extension columns
Tighten the bolts
Fig.
20
Drilling
Cleaning
Bolting
5
7/
8”
1
Summary of Contents for OH-12
Page 1: ...Two Post Lift Model OH 12 Original...
Page 4: ...2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4...
Page 17: ...15 K Lift the carriages up by hand and make them be locked at the same level See Fig 26 Fig 26...
Page 28: ...26 IV EXPLODED VIEW Model OH 12 Fig 40...
Page 34: ...32 4 3 Manual Power unit 071102 220V 60HZ Single Phase Fig 43...