BEDIENUNGSANLEITUNG / INSTRUCTION MANUAL DRAGONFLIGHT 95
amewi.com
Forestay and Backstay. This tension is needed to keep the rig stable which will give you consistent
handling characteristics in different wind conditions.
13. Cut a 1000mm length of Dyneema to form the Topping Lift. Start by tying one end to the metal ring in
the Forestay (See photo 11). Then tie the bottom end of the cord to the ring attached to the Bowsie
adjuster at the back end of the Jib Boom. Adjust the Bowsie to allow a little slack in the Jib Leech (back
edge).
14. Adjust position of Silicon Rings SR2/3 and the Jib Clew Hook so the Jib Foot can form a curve with
approximately 25mm between the centre of the boom tube and the sail foot at its midpoint.
At this stage you have completed the rigging, the next sections will cover the
fitting of ‘Sheets’ (control
lines) to the Booms and setting the rig up for best performance and boat trim.
4
5
6
9
Summary of Contents for 26079
Page 3: ......
Page 4: ......
Page 7: ...BEDIENUNGSANLEITUNG INSTRUCTION MANUAL DRAGONFLIGHT 95 amewi com ...
Page 15: ...BEDIENUNGSANLEITUNG INSTRUCTION MANUAL DRAGONFLIGHT 95 amewi com 5 6 7 8 9 10 ...
Page 16: ...BEDIENUNGSANLEITUNG INSTRUCTION MANUAL DRAGONFLIGHT 95 amewi com ...
Page 21: ...BEDIENUNGSANLEITUNG INSTRUCTION MANUAL DRAGONFLIGHT 95 amewi com 11 13 ...
Page 22: ...BEDIENUNGSANLEITUNG INSTRUCTION MANUAL DRAGONFLIGHT 95 amewi com ...
Page 27: ...BEDIENUNGSANLEITUNG INSTRUCTION MANUAL DRAGONFLIGHT 95 amewi com 1 2 3 4 5 7 7 ...
Page 31: ...BEDIENUNGSANLEITUNG INSTRUCTION MANUAL DRAGONFLIGHT 95 amewi com ...
Page 32: ......