![Ametek Z-tron IV Installation And Operating Instructions Manual Download Page 24](http://html1.mh-extra.com/html/ametek/z-tron-iv/z-tron-iv_installation-and-operating-instructions-manual_2931230024.webp)
18
Z-tron IV
TM
Point Level Control
Section 4:
Calibration
This section contains the calibration information for the
Z-tron IV Level Control.
CAUTION:
Do not open enclosure cover without verifying
area is non-hazardous or make/break any electrical
connections without first disconnecting electrical
power at the source.
Ensure that wiring, electrical fittings and conduit
connections conform to the electrical codes for the
specific location.
The Z-tron IV level control is a general purpose device
and is not agency approved for use in hazardous
locations. If agency approval is required, contact your
local AMETEK Drexelbrook representative or call 215-
674-1234
4.1 Calibration in Conducting Material
700-0001-002 & 700-0001-018
Set to HLFS
Raise level to desired alarm point (1" minimum probe
covered). Turn setpoint adjustment counterclockwise until
red LED turns on. Set failsafe as required.
All Other Sensing Elements
All Z-tron IV controls are factory set to switch in conductive
materials [setpoint adjustment is set to full clockwise (CW)
position]. No calibration adjustment is necessary.
If this instrument had been previously adjusted for use in
a insulating materials, and is now intended for use in a
conducting material, use a small screwdriver to turn the
setpoint adjustment to the full clockwise (CW) position. No
other adjustment is necessary.
Summary of Contents for Z-tron IV
Page 4: ...Table of Contents...
Page 6: ...Section 1...
Page 11: ...Installation 5 2 3 Integral Mounting Dimensions Figure 2 3 1 Mounting Dimensions...
Page 23: ...Section 4...
Page 27: ...Section 5...
Page 41: ......