
36
13.7 Function check
The safety measures described previously must be strictly observed
while carrying out a function check.
As soon as the test system is switched on the Power-LED should light up. If this is not the
case, then please check the mains power connection to the test system as well as the fuses
and any other cabling.
The instrument automatically carries out a diagnostic routine once it has been successfully
switched on. The generator cannot perform any test while the Interlock circuit is open.
Pulse generation can be observed at the output connectors by using a differential voltage
probe and an oscilloscope. This is a practical way to check that the system is functioning
correctly but should never be used for reference or calibration purposes.
The safety measures described previously must be strictly observed
while carrying out a function check.
13.8 Calibration
The combination of high voltages and high frequencies in a single pulse makes the
calibration of EMC pulse generators particularly demanding and difficult. Teseq has one of
the few accredited test laboratories in Europe, Asia and USA that is in the position to
undertake calibrations in this specialized field.