
ThePoint Series
32
ATEX
Integral
II 2G Ex db ia IIC T5 Gb
II 2D Ex tb ia IIIC T95 oC Db
-30'C < To < 70oC
Remote
II 2 (1)G Ex db [ ia Ga] IIC T5 Gb
II 2 (1)D Ex tb [ ia Ga] IIIC T95 oC Db
-30'C < To < 70oC
FM 16ATEX0024X
IECEx
Integral
Ex db ia II C T5 Gb
Ex tb ia IIIC T90oC Db
-30'C < To < 70oC
Remote
Ex db [ia Ga] IIC T5 Gb
Ex tb [ia Ga] IIIC T95oC Db
IECEx FMG 10.0017X
4.1
Approvals Available
Remote:
Explosion-proof for Class I, Division 1, Groups A, B, C, and D;
Dust-Ignition proof for Class II, III, Division 1, Groups E, F, and
G; Non-incendiary for Class I, Division 2, Groups A, B, C, & D;
Suitable for Class II, III, Division 2, Groups F & G hazardous
outdoor Type 4, 4X, IP66 (classified) locations with Intrinsically
Safe connections to Class I, II, III, Division 1, Groups A, B, C,
D, E, F, and G hazardous (classified) locations in accordance
with Control Drawing 420-0004-181-CD.
Integral:
[Same, but Group A does not apply]
2460
Summary of Contents for ThePoint Series
Page 4: ...Contents...
Page 6: ...Section 1...
Page 28: ...ThePoint Series 22 Section 3...
Page 36: ...Section 4...
Page 39: ...Control Drawings 33 Section 5 Control Drawings 5 1 FM FMc Control Drawings...
Page 40: ...ThePoint Series 34 5 1 FM FMc Control Drawings Continued...
Page 41: ...Control Drawings 35 5 1 FM FMc Control Drawings Continued...
Page 42: ...ThePoint Series 36 5 1 FM FMc Control Drawings Continued...
Page 43: ...Control Drawings 37 5 1 FM FMc Control Drawings Continued...
Page 44: ...ThePoint Series 38 5 1 FM FMc Control Drawings Continued...
Page 45: ...Control Drawings 39 5 1 FM FMc Control Drawings Continued...
Page 46: ...ThePoint Series 40 5 1 FM FMc Control Drawings Continued...
Page 47: ...Control Drawings 41 5 1 FM FMc Control Drawings Continued...
Page 48: ...ThePoint Series 42 5 1 FM FMc Control Drawings Continued...
Page 49: ...Control Drawings 43 5 1 FM FMc Control Drawings Continued...
Page 50: ...ThePoint Series 44 5 2 ATEX Control Drawings...
Page 51: ...Control Drawings 45 5 2 ATEX Control Drawings Continued...
Page 52: ...ThePoint Series 46 5 2 ATEX Control Drawings Continued...
Page 55: ...Control Drawings 49 5 2 ATEX Control Drawings Continued...
Page 56: ...ThePoint Series 50 5 3 Heavy Duty Spark Protection...
Page 57: ...Control Drawings 51 5 3 Heavy Duty Spark Protection Continued...
Page 58: ...ThePoint Series 52 5 4 Adding a Padded Capacitor...
Page 59: ...Control Drawings 53 5 4 Adding a Padded Capacitor Continued...
Page 60: ...ThePoint Series 54 5 4 Adding a Padded Capacitor Continued...
Page 61: ...Control Drawings 55 5 5 Dual Seal Assembly for 700 Series Sensing Elements...
Page 62: ...ThePoint Series 56 5 5 Dual Seal Assembly Continued...
Page 63: ...Control Drawings 57 5 5 Dual Seal Assembly Continued...
Page 64: ...Appendix A...
Page 69: ......