Position diagonal braces in bays between uprights, Figure 5. At top of center upright,
attach the two mating diagonals using all thread bolts (F), flat washers (J), and frame
nuts (H) as shown in Figure 4. At all other diagonal to upright connections, attach with
frame bolts (E1), flat washers (J), and frame nuts (H). Tighten all nuts thoroughly.
5.
Square the gate by measuring from corner to corner on frame as shown in Figure 5. Dimensions “X” and “Y”
should be equal (+/- ¼”) Tighten all nuts thoroughly.
6.
8.
X
Y
Figure 5
Attach safety mesh (K) to bottom 6’ of gate (Note: Zipties supplied; installer is responsible fo
r attachment
method). Sufficient mesh is provided to also cover fence that runs parallel to gate travel path.
7.
Figure 4
Figure 6
Track is predrilled its entire length so that pickets (D) can be attached either left or right depending on the
direction of the gate opening. If gate opens to the right, install pickets from left end; if gate opens to the left,
install pickets from the right end. Position pickets (D) to align with pre-drilled holes in tracks, attach with picket
bolts (G) and picket nuts (I) as shown in Figure 6 & 6a. Tighten all nuts thoroughly.
Figure 6a
Bottom Guide Track
Gates < 24’ opgs
Top & Bottom Enclosed Track
Gates > 24’ opgs
5
5
PART # TP-II INST | 07/2018
AMERISTARFENCE.COM
|
888-333-3422