ORNAMENTAL CANTILEVER

GATE INSTRUCTIONS

All gates require two 4” square truck bracket mounting posts, one to act as Fulcrum Post, the second as Tail 

Support Post.  Set these mounting posts in an off-line configuration as shown in Figure 1.  Check grade condi-

tions to ensure posts are set to proper height; allow no more than four (4) inches from bottom of gate to grade.  

A Supplemental Latch Post, located as shown in Figure 1, is required to mount patented offset latches (see Step 

11 - Page 6).  See post set table page 2. 

 1.

FIGURE 1

*NOTICE:  Ornamental Cantilever Gates are supplied with rolls of 2” mesh safety screening in sufficient quanti-

ties to cover the entire gate (including overhang) and an equal portion of fence parallel to the gate in the open 

position up to a height of over 6 feet from ground elevation.  This screening must be included when the TransPort 

Gate is assembled at the jobsite.  Additionally, all of the safety requirements of ASTM F2200 must be met during 

installation.  Failure to incorporate the safety mesh or follow ASTM F2200 safety requirements during gate as-

sembly and installation will cause rejection (under UL-325) of the entire gate system any time an attempt is made 

to attach the gate to an automatic gate  operator.  Ameristar assumes no responsibility for gate installations that 

fail to utilize the materials provided or meet the applicable safety standards.

GATE OUT-TO-OUT

NOTE: FACE OF END POST TO CENTER OF 

TAIL POST EQUALS GATE OUT-TO-OUT 

MINUS 8 INCHES (MAX) 

NOTE: FACE OF END POST TO CENTER OF 

FULCRUM POST EQUALS CLEAR OPENING 

PLUS 8 INCHES (MIN)

FULCRUM POST

TAIL POST

FENCE LINE

CLEAR OPENING

CANTILEVER GATE

FENCE POST

FENCE LINE

FENCE POST

SUPPLEMENTAL 

LATCH POST

GATE LATCH - 

(SEE STEP 11

ON PAGE 5)

8”

1

1

PART # TP-II INST | 07/2018

AMERISTARFENCE.COM

  

|

  

888-333-3422

Summary of Contents for TransPornt II

Page 1: ...t from ground elevation This screening must be included when the TransPort Gate is assembled at the jobsite Additionally all of the safety requirements of ASTM F2200 must be met during installation Fa...

Page 2: ...NSPORT ASSEMBLY INSTALLATION INSTRUCTIONS TRANSPORT II POST SET TABLE Clear Opening Gate Out To 0ut Face to Latch Post to Center of Gate Post Suggested Location 1st Gate Post Fulcrum Post Suggested Lo...

Page 3: ...pg 1 1 1 1 1 1 1 1 1 B Uprights 2 SQ 3 3 5 5 5 5 7 7 7 9 9 C Diagonals 2 SQ plated 2 2 4 4 4 4 6 6 6 8 8 D Pickets 1 SQ 21 27 31 37 42 48 55 59 63 73 79 E1 Frame Bolts 3 8 x 3 16 16 32 32 32 32 48 48...

Page 4: ...rt splice block as shown in Figure 2A Line up pre drilled holes attach with frame bolts E1 splice bolts E2 flat washers lock washers J and frame nuts H Tighten all nuts thoroughly Align long left trac...

Page 5: ...te Zipties supplied installer is responsible for attachment method Sufficient mesh is provided to also cover fence that runs parallel to gate travel path 7 Figure 4 Figure 6 Track is predrilled its en...

Page 6: ...1 of thread above bracket 7C Install truck assembly brackets onto gateposts facing the public side of the gate utilizing u bolts provided aligning them so that gate will hang level horizontally with b...

Page 7: ...es shall be used to provide positive attachment of the Safety Mesh to the gate leaf adjacent fence line It is recommended attaching Safety Mesh to the gate frame prior to picket or pale installation S...