background image

Remove all gate components including tracks, uprights, diagonal braces, pickets, hardware and safety accessories. 

Spread out neatly, preferably in a large flat clean area. Use wood pallets, or studs to keep items from coming in 

contact with ground.  Check quantities against appropriate gate opening on Parts List below.

 2.

Gate Opening

6’ to 8’

> 8’ to 

10’

> 10’ to 

12’

> 12’ to 

14’

> 14’ to 

16’

> 16’ to 

18’

> 18’ to 

20’

> 20’ to 

22’

> 22’ to 

24’

>24’ to 

27’

> 27’ to 

30’

Gate Out-to-Out

144.5”

182.5”

211”

249”

287”

325”

372.5”

401”

429.5”

496”

534”

Parts

Quantities

Components

UL

Top Enclosed 

Track

1

1

1

1

1

1

1

1

1

1 Short 

Left

1 Short 

Left

UR

-

-

-

-

-

-

-

-

-

1 Long 

Right

1 Long 

Right

LL

Bottom 

Enclosed Track 

> 24’ opg

-

-

-

-

-

-

-

-

-

1 Long 

Left

1 Long 

Left

LR

-

-

-

-

-

-

-

-

-

1 Short 

Right

1 Short 

Right

A

Bottom Guide 

Track < 24’ opg

1

1

1

1

1

1

1

1

1

-

-

B

Uprights

2” SQ

3

3

5

5

5

5

7

7

7

9

9

C

Diagonals

2” SQ (plated)

2

2

4

4

4

4

6

6

6

8

8

D

Pickets

1” SQ

21

27

31

37

42

48

55

59

63

73

79

E1

Frame Bolts

3/8” x 3”

16

16

32

32

32

32

48

48

48

68

68

E2

Splice Bolts

3/8” x 4”

-

-

-

-

-

-

-

-

-

12

12

F

All-Thread Bolt

3/8” x 4”

2

2

2

2

2

2

2

2

2

2

2

G

Picket Bolts

1/4” x 1-1/2”

42

54

62

74

84

96

110

118

126

146

158

H

Frame Nuts

3/8” Lock Nut

20

20

36

36

36

36

52

52

52

84

84

I

Picket Nuts 

1/4” Lock Nut

42

54

62

74

84

96

110

118

126

146

158

J

Flat Washer / 

Lock Washer 

3/8”

36

36

68

68

68

68

100

100

100

160/4

160/4

Hardware

Truck 

Assemblies

2

2

2

2

2

2

2

2

2

4

4

Truck Brackets

2

2

2

2

2

2

2

2

2

4

4

Gate Latch

1

1

1

1

1

1

1

1

1

2

2

Gate Stop

2

2

2

2

2

2

2

2

2

2

2

Guide Roller 

Assembly

2

2

2

2

2

2

2

2

2

-

-

Safety

K

Safety Mesh

50’ Roll 50’ Roll 50’ Roll 50’ Roll 50’ Roll

100’ 

Roll

100’ 

Roll

100’ 

Roll

100’ 

Roll

100’ 

Roll

100’ 

Roll

PARTS LIST

3

3

PART # TP-II INST | 07/2018

AMERISTARFENCE.COM

  

|

  

888-333-3422

Summary of Contents for TransPornt II

Page 1: ...t from ground elevation This screening must be included when the TransPort Gate is assembled at the jobsite Additionally all of the safety requirements of ASTM F2200 must be met during installation Fa...

Page 2: ...NSPORT ASSEMBLY INSTALLATION INSTRUCTIONS TRANSPORT II POST SET TABLE Clear Opening Gate Out To 0ut Face to Latch Post to Center of Gate Post Suggested Location 1st Gate Post Fulcrum Post Suggested Lo...

Page 3: ...pg 1 1 1 1 1 1 1 1 1 B Uprights 2 SQ 3 3 5 5 5 5 7 7 7 9 9 C Diagonals 2 SQ plated 2 2 4 4 4 4 6 6 6 8 8 D Pickets 1 SQ 21 27 31 37 42 48 55 59 63 73 79 E1 Frame Bolts 3 8 x 3 16 16 32 32 32 32 48 48...

Page 4: ...rt splice block as shown in Figure 2A Line up pre drilled holes attach with frame bolts E1 splice bolts E2 flat washers lock washers J and frame nuts H Tighten all nuts thoroughly Align long left trac...

Page 5: ...te Zipties supplied installer is responsible for attachment method Sufficient mesh is provided to also cover fence that runs parallel to gate travel path 7 Figure 4 Figure 6 Track is predrilled its en...

Page 6: ...1 of thread above bracket 7C Install truck assembly brackets onto gateposts facing the public side of the gate utilizing u bolts provided aligning them so that gate will hang level horizontally with b...

Page 7: ...es shall be used to provide positive attachment of the Safety Mesh to the gate leaf adjacent fence line It is recommended attaching Safety Mesh to the gate frame prior to picket or pale installation S...

Reviews: