16 //
24
P/N: 630-00047 RevB 11519
Hercules II 600 Vertical Platform Lift Install Manual | www.Ameriglide.com | 866-378-6648
SETTING LIMIT SWITCHES
This lift is equipped with upper and lower limit switches. The vertical
location of these switches may be adjusted to fit your application.
Typically, the upper limit switch will need to be adjusted so the platform
will stop level with the upper landing. The lower limit will typically not need
adjusting.
Setp 1: Verify the emergency switch is in the ON position. Run the lift in
the up direction until the platform floor is level with the upper landing.
Setp 2: Unplug the lift’s power cord from the wall before going to
the next step (AC units) Unplug the power cable from the battery
box before going to the next step; (DC units)
Setp 3: Remove the front cover by tilting it forward and lifting
upwards. The bottom of the front cover sets on a pin on either side of
the lift frame. Set the cover aside in a safe location where it will not
become damaged.
Setp 4: Loosen the bolts that attaches the upper limit switch
assembly. Slide the assembly down the track until the lower switch in
the assembly comes in contact with the stop bracket on the lift’s car.
You should hear the limit switch click as contact is made.
Step 5: Replace the front cover and secure it with the screw you removed in Step 3 (page 7).
Step 6: Plug the lift’s electrical cord into the wall. Verify that the emergency switch is in the ON
position.
Step 7: Run the lift in the down direction for several inches. Next, run the lift in the up direction.
Continue to press the up button until the upper limit switch has caused the lift to stop. Be sure
the lift platform stops level with the landing platform.
Warning
Moving components can cut and crush. Do not operate the lift if
you are in close proximity to any drive components. Be aware that
loose clothing or jewelry may catch on moving parts.
LIMIT SWITCHES
Summary of Contents for AMGHERC600-4
Page 24: ...P N 630 00047 RevB 11519 ...