SENSORRAIL IIIE ADRL3TRK SERIES 

8200-0593-02, REV. A 

INSTALLATION GUIDE 

1 of 34

 

SensorRail

 IIIE 

ADRL3TRK Series 

SpeedDome

®

 

Ultra Programmable 

Dome on a Rail

 

Installation Guide 

CAUTION: 

Only a certified installer is 

authorized to install this equipment. 
Installation by anyone else will void the 
SensorRail warranty. 

Contents 

About this Guide ............................................................ 1

 

About the Product .......................................................... 1

 

Before You Begin........................................................... 3

 

Installation Steps ........................................................... 5

 

1. Install Threaded Rods ............................................ 5

 

2. Install PVC Holders ................................................ 6

 

3. Install Stirrups, Eyebolts, and Jointing Plates ........ 6

 

4. Install Rail Sections................................................ 7

 

5. Install Anti-Sway Cables ........................................ 8

 

6. Insert Copper Tracks  
and Trolley Stop/Retrieval Tool.................................. 9

 

7. Install Optical Stop Labels.................................... 10

 

8. Install the PowerRail Module................................ 11

 

9. Install the Camera Trolley .................................... 12

 

10. Attach Light Reducing Sections ........................... 13

 

11. Clean the Rail ...................................................... 13

 

12. Check Electrical Connections .............................. 13

 

13. Configure the System .......................................... 14

 

14. Install the Cowling................................................ 15

 

15. Install End Covers................................................ 16

 

Ordering Parts ............................................................. 17

 

Specifications .............................................................. 20

 

Declarations................................................................. 21

 

Appendix A: 

RF link DIP switch settings .................... 32

 

Appendix B: 

Alternate RF antenna location ............... 32

 

Appendix C: 

AD SensorRail Control Utility................. 33

 

 

 

© 2006 Sensormatic Electronics Corporation 

About this Guide 

This guide explains how to install the SensorRail 
IIIE system. It does not explain how to: 

  Determine the exact mounting location of the 

rail. This is determined by the customer’s needs 
and the site’s ceiling structure. 

  Program or operate the system. See 

SensorRail 

IIIE User Guide

 8200-0593-04 and 

SpeedDome 

Ultra and AD Matrix User Guides

  Service the system. See Service Guide 

8200-0593-03. 

If you need assistance... 

Contact your certified support representative. 

About the Product 

The SensorRail IIIE system enables a SpeedDome 
Ultra dome camera to transmit video as it moves 
along a rail to the ideal surveillance position. 
The system consists of: 

  2.5m (8.2ft) rail sections (number determined by the 

total length of the rail) with installation hardware 

  A light-reducing section at each end of the rail 

  Ceiling suspension assembly, which includes M8 

threaded rods, ceiling attachment hardware (not 
supplied), and mounting stirrups 

 Copper 

tracks 

  Camera trolley equipped with dome camera, RF 

transmit antenna, and motor 

  PowerRail module that supplies dc power to the 

camera trolley, converts RS-422 data to RS-232 data 
used by the trolley, and receives the video signal 
from the dome camera 

  Trolley stop and retrieval tool 

  RF receive antenna. 

IMPORTANT!

 At least two people are required to 

install this product safely and efficiently. Follow all 
procedures described in this guide explicitly. If 
installation difficulties occur, call: 

American Dynamics Technical Services 

Toll Free 800-507-6268, Option 2 
International: 561-912-6259, Option 2 

In Europe: 

Technical Services at EMEA AD Technical Support 
+800 CALL TYCO or (+800 22 55 8926) 
From the UK: 08701 238 787 
Direct: +31 475 352 722 

Summary of Contents for SensorRail IIIE

Page 1: ...he customer s needs and the site s ceiling structure Program or operate the system See SensorRail IIIE User Guide 8200 0593 04 and SpeedDome Ultra and AD Matrix User Guides Service the system See Service Guide 8200 0593 03 If you need assistance Contact your certified support representative About the Product The SensorRail IIIE system enables a SpeedDome Ultra dome camera to transmit video as it m...

Page 2: ...o 1 5m 4 9ft Dead Zones Vision Area Two 1 5m 5ft Dead Zones Two 30cm 1ft Light Reduction Sections Total Length of Rail Total Length of Rail Two 0 6m 2ft Maintenance Areas Rail End Cover 2 RF Rx Antenna RF Tx Antenna Camera Trolley Dome Camera Collector 4 Mirrored Cowling Rail Section Jointing Plate 4 per section PVC Holder w copper tracks M8 Threaded Rod Stirrup Optical Stop Label one at each end ...

Page 3: ... be required to attach the rail to ceiling red iron Acoustic Tile Ceilings WARNING DO NOT mount the rail structure directly to an acoustic tile ceiling it cannot support the weight Instead extend threaded rods through the tile to a rigid ceiling structure capable of supporting the weight Space Requirements Allow at least 60cm 24in from the ends of the rail to vertical surfaces such as walls to ena...

Page 4: ...s to be Purchased Separately M8 threaded rods and related hardware and ceiling connection assemblies 3 3mm 1 8in cable as needed steel galvanized 7x19 strands minimum working load limit 680kg 1500 lbs 8mm 5 16in galvanized eyebolts 317kg 700 lbs minimum working load limit U bolt clamps and wire thimbles for 3 3mm 1 8in cable 9 6mm 3 8in minimum size diameter jaw jaw turnbuckles 544kg 1200 lbs brea...

Page 5: ...ystem to the ceiling Each rod attaches to the ceiling using one of the following methods Direct into the ceiling To red iron ceiling supports using a fast grip system such as a HILTI MF C31 8 To a suspension bar such as a HILTI MQ 41 between red iron when ceiling supports are spaced more then 2 5m 8 2ft apart The bottom of each rod attaches to a stirrup at the top of the rail section Tools Equipme...

Page 6: ...de the rail This half will insert into the next rail section 3 Install Stirrups Eyebolts and Jointing Plates A stirrup is required to mount each section to the threaded rod above Four jointing plates are required to attach it to the previous rail section Eyebolts are attached in pairs to the top grooves in the overall rail to attach anti sway cables as required Tools Equipment and Parts Required f...

Page 7: ...he scissor lift raise the sections until the rods just touch the holes of each stirrup 2 CAREFULLY raise sections further until the rods enter the holes in the stirrups and the top of the stirrups are butted against the nuts on the rods 3 Secure each rail section to the rod using a Nylon stop nut DO NOT tighten the nut C Level the rail sections 1 Level sections by adjusting the two center screws i...

Page 8: ...ebolts shoulder lifting eyes smaller length threads 317kg 700 lbs minimum working load limit U bolt clamps wire thimbles for 1 8 inch cable 9 6mm 3 8in diameter jaw jaw turnbuckles 544kg 1200 lbs break strength 362kg 800 lbs working load limit Procedure At the ceiling A Install I beam clamps on the side of the beam opposite the cable pull direction B Thread an eyebolt into the beam clamp where the...

Page 9: ... screw to secure the tape 4 Insert the service block with the tape attached Ensure the tape faces the start end of the rail C Insert the service trolley handle first into the rail D Assemble the reel that holds the rolls of copper track 1 Lay out the five supplied wheels on the ground and insert six screws in one of the wheels 2 Place a copper roll on the wheel with the six screws then place anoth...

Page 10: ...top labels affix inside the rail nearest the PVC holder to enable the trolley to recognize the beginning and end of its route WARNING Beginning and end optical stop label locations are different Incorrect label application can cause a hazardous situation WARNING Stop labels are made of special tape that enables the optical sensor in the trolley to work Do not use any other tape Tools Equipment and...

Page 11: ...ure the RF cable from the module reaches the intended antenna mounting site within the rail B Connect power from the module to the rail Attach one end of the 27Vdc and ground wires to the module and crimp their other end to the rail Ensure wires are long enough to reach the copper tracks without stretching C Connect data from the module to the rail Attach one end of the Tx RS 232 data and Rx RS 23...

Page 12: ...hanism before locking the dome in place B Remove the service block at the start end of the rail holding the tape in place and slide the camera trolley onto the rail With its antenna facing the starting end of the rail carefully insert the trolley wheels onto the rolling track and roll the trolley about 1m 3 3ft down the rail C Install the RF receiving antenna 1 Insert the plastic bracket supplied ...

Page 13: ... 2 Uniformly butt a light reducing section to the rail by sliding the mating groove of that section over the protruding jointing plate No space should be between the two sections 3 Center the jointing plates over the joint and hand tighten the outside screws of all plates 4 Secure the top hat to the light reducing section by inserting screws and nuts through holes in the top hat flange that faces ...

Page 14: ...ensorRail Control configurator screen shown above to test the trolley and dome camera functions Also check the entire rail for joint alignment To initiate the trolley for the first time 1 Connect a DB25 to DB9 communication cable between the laptop and the PowerRail module A standard crossed serial cable wired as shown is required see figure on page 31 2 In the Power Rail module move jumpers ST3 a...

Page 15: ...nable the edges to fold toward its mirrored side The fold allows the cowling to secure to the rail grooves Note This is a two person job Tools Equipment and Parts Required for this Operation Proper lift equipment scissor lift with extended work platform is recommended Cowling roll Plastic card similar to a credit card do not use your personal credit card Ruler and cutter Soft white gloves Procedur...

Page 16: ...of 34 15 Install End Covers Tools Equipment and Parts Required Proper lift equipment scissor lift with extended work platform is recommended End covers 2 Cover screws 8 Install an end cover to each end of the rail using four Phillips head screws each INSTALLATION IS COMPLETE ...

Page 17: ...ving system accessories with gear belt universal ADRL3CMF25U OBS SensorRail III sliding contact universal ADRL3CPUU SensorRail III CPU board PAL ADRL3RFT24P SensorRail III RF link transmitter 2 4GHz PAL ADRL3ATEN24U SensorRail III RF transmitter antennas 2 4GHz PAL ADRL3RFT58P SensorRail III RF transmitter 5 8GHz PAL ADRL3ATEN58U SensorRail III PowerRail RF antenna transmitter 5 8GHz PAL KST25 Set...

Page 18: ...I copper tracks 20m 65 62ft 4 rolls of 20m universal ADRL3CUI25U SensorRail III copper tracks 25m 82 02ft 4 rolls of 25m universal ADRL3CUI30U SensorRail III copper tracks 30m 98 43ft 4 rolls of 30m universal ADRL3CUI35U SensorRail III copper tracks 35m 114 83ft 4 rolls of 35m universal ADRL3CUI40U SensorRail III copper tracks 40m 131 23ft 4 rolls of 40m universal ADRL3CUI45U SensorRail III copper...

Page 19: ...5m 147 64ft universal ADRL3BUL50U SensorRail III mirrored cowling 50m 164 04ft universal ADRL3BUL55U SensorRail III mirrored cowling 55m 180 45ft universal ADRL3BUL60U SensorRail III mirrored cowling 60m 196 85ft universal ADRL3BUL65U SensorRail III mirrored cowling 65m 213 25ft universal ADRL3BUL70U SensorRail III mirrored cowling 70m 229 66ft universal ADRL3BUL75U SensorRail III mirrored cowling...

Page 20: ...urrent 240mA RF link receiver RF frequency range 2 4 2 483GHz PAL over 5 channels Video output Composite PAL 1V p p Sensitivity 86dBm 21dBµV Power supply 8 10Vdc Nominal current 250mA Trolley motor Nominal voltage 24Vdc Nominal speed 6700rpm clockwise Nominal torque 1250m Nm Nominal current w o load 0 120A Speed constant 287rpm V Cabling Power IEC connector Video Coaxial RG59 U RS 422 data Cat 5 1...

Page 21: ... manual was current when published The manufacturer reserves the right to revise and improve its products All specifications are therefore subject to change without notice LIMITED RIGHTS NOTICE For units of the Department of Defense all documentation and manuals were developed at private expense and no part of it was developed using Government Funds The restrictions governing the use and disclosur...

Page 22: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 22 of 34 2 A 5cm B 1 A D B C 5cm 2in 2 5m 2 5m 90cm 50cm 10cm 1 2 3 30cm 1 25m 2 5m E M8 Rod PVC Holder Rail Section ...

Page 23: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 23 of 34 A C 3 4 2 1 3 4 5 6 B A C D B D ...

Page 24: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 24 of 34 5 A D B C G E F SIDE VIEW TOP VIEW Eyelet location Right Way for Maximum Cable Strength ...

Page 25: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 25 of 34 6 D C E F G A B C I J H Screws 6 ...

Page 26: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 26 of 34 7 A B ...

Page 27: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 27 of 34 Track 1 2 3 4 Rx Tx PowerRail 27Vdc Ground 1 2 3 4 Track PowerRail B 8 A E F C ...

Page 28: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 28 of 34 0 0 1 C 15cm D 3mm 9 A B ...

Page 29: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 29 of 34 10 11 ...

Page 30: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 30 of 34 12 13 DB25 Female PowerRail side DB9 Female PC side 2 3 7 2 3 5 To PC ST3 ST4 Conv PC PowerRail ...

Page 31: ...SENSORRAIL IIIE ADRL3TRK SERIES 8200 0593 02 REV A INSTALLATION GUIDE 31 of 34 15 x2 Cowling Plastic Card 14 Mirrored external Side Direction of Ply A B C ...

Page 32: ...e following alternate frequencies using the four position DIP switch located on the transmitter board of the trolley DIP Switch Channel 1 2 3 4 Channel 1 2414 5MHz ON OFF OFF OFF Channel 2 2428 5MHz OFF ON OFF OFF Channel 3 2442 5MHz ON ON OFF OFF Channel 4 2456 5MHz OFF OFF ON OFF Channel 5 2470 5MHz ON OFF ON OFF Appendix B Alternate RF antenna location Use Install Kit ADRL3RXBRK ...

Page 33: ...he pattern just defined click PATTERN If the pattern is acceptable click SET and then PATTERN to replace the pattern designated at the beginning of the definition sequence Auto Focus Click to return iris and focus functions to automatic Sequence The software is capable of creating 16 different sequences each with 16 steps You can setup sequences by following these procedures To program a sequence ...

Page 34: ...ilometers Trolley Reset Position Click the appropriate radio button to change the trolley reset position to be either at the start of the rail or at the end of the rail Trolley Direction Used when two rails are installed back to back Click the appropriate radio button to have the trolley run normally or to reverse its movement so camera movement is correct when viewed on a monitor when normal rail...

Reviews: