113406-1
www.amdry.com
19
The neutral will only be used on 4-wire service. This is typical for 380-416V, 50 Hz.
CAUTION:
The dryer
must be
grounded. A ground lug has been provided for this purpose.
Input connection wiring
must be
sized properly to handle
the dryer’s current draw. This information is printed on
the dryer’s data label.
The electrical input connections are made at the electric
oven contactor located inside the assembly at the rear
center upper section of the dryer. The ground connection
is made to a copper lug also provided in this area. To
gain access, remove oven rear service cover.
IMPORTANT:
A strain relief
must be
used where the
input wiring enters the oven assembly.
4. Electrical Connections
A wiring diagram is located inside the control box for connection data.
If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/pigtail
(wire size
must conform
to rating of dryer), or the dryer can be hard wired directly to the service breaker
panel. In both cases, a strain relief
must be
installed where the wiring enters the dryer.
IMPORTANT:
A separate protected circuit
must be
provided to each dryer.
3-Phase (3ø) Wiring Connections/Hookup
The electrical connections on
ALL
3-phase (3ø) gas and steam dryers are made into the rear service box
located at the lower left area of the dryer. The electrical connections are made at the power distribution
block located in the service box. The ground connection is made to the copper lug, also provided in this box.
To gain access, the service box cover
must be
removed.
Summary of Contents for ML-175
Page 54: ...ADC113406 1 01 07 05 3 ...