
113406-1
www.amdry.com
7
CAUTION:
This dryer produces combustible lint and
must be
exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint buildup.
IMPORTANT: Dryer must be installed in a location/environment, which the ambient
temperature remains between 40° F (4.44° C) and 130° F (54.44° C)
.
B. UNPACKING/SETTING UP
Remove protective shipping material (i.e., plastic wrap and/or optional shipping box) from dryer.
IMPORTANT:
Dryer
must be
transported and handled in an upright position at
ALL
times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To remove
skid from the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid.
Two (2) are at the rear base, and two (2) are located in the bottom of the lint chamber. To remove the two (2)
lag bolts located in the lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing
the lint door in place.
1. Leveling Dryer
a. To level the dryer, place 4-inch (10.16 cm) square metal shims or other suitable material under the base
pads (refer to the
illustration above
). It is suggested that the dryer be tilted slightly to the rear.
b. The V-belts are disconnected from the basket (tumbler) drive motor for shipping. Reconnect V-belts
before starting the dryer.
Summary of Contents for ML-175
Page 54: ...ADC113406 1 01 07 05 3 ...