21
The duct work
must be
smooth on the inside with no projections from sheet metal screws or other
obstructions which would collect lint. Inspection doors
must be
installed at strategic points in the duct work
for periodic lint removal.
Use smooth sweeping elbows instead of sharp 90º elbows. The radius of an elbow
should be
at least
1-1/2 times the duct diameter.
When the exhaust duct goes through a combustible wall on a roof, leave a 2-inch (5.08 cm) clearance space
between the exhaust ducting and the wall or roof.
When adding ducts, the duct that leaves the building
must be
protected from the weather. For horizontal
ducting use a 90º turned downward. For vertical duct work use a 180º turned downward. In either case,
allow at least twice the diameter of the duct between the duct opening and nearest obstruction. (If the duct
is rectangular, leave twice the smallest face dimension.)
IMPORTANT
:
DO NOT
use screen or caps on the outside opening of the exhaust duct work.
Screens will clog with lint and caps will restrict the exhaust airflow.
Summary of Contents for ADS-464 II
Page 80: ...ADC113074 1 01 24 00 10 ...