10
c. Reassemble The Tumbler (Basket) Section To The Tumbler (Basket) Base
Lift the tumbler (basket) section with a cable through the eye bolts on top of the section. Slowly lower the
tumbler (basket) section over the tumbler (basket) base. The four (4) large slots located on the bottom of
the tumbler (basket) section (one slot at each corner of the tumbler [basket] section)
must be
aligned
with the tapped holes in the cylinder cleaves located at the top of the tumbler (basket) section. Use the
four (4) 1-1/4-12 x 3-1/2 long bolts supplied with the unit to secure the tumbler (basket) section to the
tumbler (basket) base section.
d. Reattach The Control Pendant Arm
Position the control pendant arm on the top front of the heat console section by aligning the clearance
holes in the arm over the 1/4-20 tapped holes in the top of the heat console section. Use the 1/4-20 x 3
long bolts supplied with the unit to attach the arm to the console.
e. Reconnect The Internal Air, Electric Connections, and Water Connections (refer to
page 12 through
page 17
).
Summary of Contents for ADS-464 II
Page 80: ...ADC113074 1 01 24 00 10 ...