72
The drain cock of the water throwed by the desalinator, bilges pumps manual and electric, is
located in the engine room portside.
Pict. 68 – Wasted water drain cock (photographed open)
About the sump : the sump is located in the aft end of the keel. We can access to it from
the engine room. Wasted water (grey water) of the aft shower, galley’s sink, washing
machines, forward shower and anchor box flow into it.
Water of the sump is drained using 2 pumps :
-
electrical bilge pump,
-
manual bilge pump.
If needed, access to the sump is easier by releasing the plastic and the intakes pipes. Clean
with a brush (see 4.13.1)
Drain
cock
Draining electric bilge pump
Draining desalinator
Draining manual
Bilge pump
Summary of Contents for Super Maramu 2000
Page 5: ...6 7 Index 143...
Page 7: ...9 Super Maramu 2000 Serial number FR AML SM Name Delivery date Flag Hailing port Owners...
Page 58: ...63 Pict 53 Aft compartment seacock photographed open Pict 54 Storage of the aft wood bar...
Page 73: ...78 Pict 74 Fresh water pump Fresh water pump Air conditioning pump Sensor...
Page 139: ...146 Version 1 0 April 2001...