![Ambirad HCHE 120 Installation Servicing & Operating Instructions Download Page 6](http://html1.mh-extra.com/html/ambirad/hche-120/hche-120_installation-servicing-and-operating-instructions_2920681006.webp)
6/30
2.1 Natural Gas – Single Stage (table 1b)
(1) : unobstructed in still air with a terminal velocity of 0.25m/s
(2) : Condition r=5m; Q=2; A=160; louvres in neutral position
30
40
50
60
75
90
120
140
150
180
215
250
m³/hr
2500
2500
5180
5180
5180
7140
8750
10500
11500
12800
14100
17330
ft³/min
1488
1488
3083
3083
3083
4250
5208
6250
6845
7619
8393
10315
Available outlet pressure
(ducted outlet)
m
18
18
21
21
21
20
25
25
27
30
25
30
ft
59
59
69
69
69
66
82
82
88
98
82
98
Temperature rise through
°K
36
50
29
36
42
37
40
39
39
41
45
42
heater (nominal)
°F
65
90
52
65
76
67
72
70
70
74
81
76
Sound level (2) (for
guidance only)
Flue spigot outside
diameter
Total absorbed
electrical power
VCHE/HCHE Model
FRAME size
I
II
III
IV
V
Nominal air flow
Air throw (approx.) (1)
215
250
160
178
178
178
178
mm
125
125
150
2,2
3,0
178
223
4,0
4,0
5,5
223
223
223
0,9
0,9
1,6
4,0
0,55
0,55
0,74
0,74
0,74
1,5
8,4
4,6
5,1
5,8
5,5
1,6
1,6
2,4
2,8
1 1/4
ins BSP
1/2
3/4
1 1/4
Weight
kg
190
190
225
225
225
280
292
300
320
320
360
380
Pa
95
95
130
130
130
125
150
200
250
dB(A)
52
52
53
53
53
59
61
61
62
65
63
67
Main fan motor size
Electrical supply
Inlet gas connection
kW
kW
230/240V - 1N ~ 50 Hz
400/415V - 3N ~ 50 Hz
1/2
3/4
3/4
3/4
3/4
3/4
1 1/4
1 1/4