8.
lower the implement.
The transport frame support
2
is touching the
ground.
9.
Continue lowering the implement.
The catching sockets
3
are released from the
transport frame.
10.
To lock the hydraulic top link,
see section "Using the hydraulic top link".
11. Slowly drive the tractor forwards.
CMS-I-00002984
6.7.2 Unfolding the implement
REQUIREMENTS
The transport frame is uncoupled
1.
Raise the implement.
2.
actuate the "green 2" tractor control unit.
The transport lock is unloaded.
3.
Until the implement sections have reached the
end position,
Actuate the pull rope and actuate the "green 1"
tractor control unit.
4.
When the implement sections have reached the
end position,
release the pull rope and move the "green" tractor
control unit to the neutral position.
CMS-I-00002993
CMS-T-00004112-B.1
6 | Preparing the machine
Preparing the implement for operation
MG6750-EN-II | C.1 | 21.07.2021
58
Summary of Contents for KG 6002-2
Page 1: ...Original operating manual Rotary cultivator KG 6002 2 SmartLearning www amazone de...
Page 6: ......
Page 117: ......