GreenDrill 5.2 on-board computer
GreenDrill BAH0054-4 02.13
45
7.5.2.1
Calibration test without sowing table
1. Prepare the machine for the calibration test (fit the chute, see above).
2. Check that the correct sowing shaft has been fitted.
3. Fill the hopper.
4. Call up the Calibration test menu.
5. Enter the working widths
(e.g. 3.7 m).
6. Enter the travel speed
(e.g. 12.5 km/h).
7. Enter the desired spread rate
(e.g. 12.3 kg/ha).
8. Enter the calibration time.
1 minute calibration
(standard)
0.5 minute calibration
for large seeds, e.g. wheat, barley, peas
2 minute calibration
for small seeds, e.g. rape, phacelia, poppy
9. Start the calibration test.
The sowing shaft begins to rotate (without blower fan).
The sowing shaft stops automatically after the set time has
elapsed.
Summary of Contents for GreenDrill 200-E
Page 2: ...2 GreenDrill BAH0054 4 02 13...
Page 69: ......