Use of the implement
Centaya Super BAH0092-3 01.19
183
10.3
Moving the implement from transport into working position
1. Move the road safety bar of the exact following harrow to the parking position ........... Page 175
2. Move the exact following harrow into working position ................................................. Page 165
3. Move the tramline marker into working position ............................................................ Page 171
10.4
Work commencement
1. Put the implement into working position at
the beginning of the field.
2. Adjust the length of the top link (Fig. 235/1)
The setting length can be found in the sec-
tion "Coupling - Pack top seed drill and soil
tillage implement", page 126.
3. Tighten the lock nut for the top link length
adjustment.
Fig. 235
The implement
with RoTeC-Pro Control coulters is aligned
straight when the top link length is properly
adjusted.
with TwinTeC double disc coulter is aligned
such that the parallel-guided coulters are
horizontal during operation when the top
link length is properly adjusted.
The top link (Fig. 236/1) and lower link
(Fig. 236/2) run parallel to the ground. This
ensures that the coulters have enough
clearance at the top and bottom during op-
eration, with equal coulter pressure on the
short and the long coulter.
Fig. 236
Summary of Contents for Centaya 3000 Super 1600
Page 25: ...General safety instructions Centaya Super BAH0092 3 01 19 25 Fig 2 Fig 3 Fig 4 ...
Page 97: ...Layout and function Centaya Super BAH0092 3 01 19 97 Fig 98 ...
Page 223: ...Cleaning maintenance and repairs Centaya Super BAH0092 3 01 19 223 ...
Page 225: ...Hydraulic diagram Centaya Super BAH0092 3 01 19 225 Fig 281 ...
Page 227: ...Hydraulic diagram Centaya Super BAH0092 3 01 19 227 Fig 282 ...
Page 228: ......
Page 229: ......