Use of the implement
182
Centaya Super BAH0092-3 01.19
10.1
Initial operation
Before initial commissioning
Specialist work-
shop
Check and perform maintenance on the hydraulic hose lines.
This inspection has to be recorded by the operator.
Section 12.7.1
After the first 10 operating hours
Specialist work-
shop
Check and perform maintenance on the hydraulic hose lines.
This inspection has to be recorded by the operator.
Section 12.7.1
Check all the components of the hydraulic system for leaks
Specialist work-
shop
Check all bolted connections for tight fit
Section 12.8
10.2
Headlight
The floodlights can be switched (Fig. 234/1)
on the ISOBUS control terminal or
with a light switch on the power cable.
The power cable is inserted in 3-pin
standard socket in the tractor cab.
Fig. 234
When transporting the implement on public roads, switch off the flood-
lights.
The connection of additional or non-approved floodlights can lead to
complete job computer failure and warranty loss!
Summary of Contents for Centaya 3000 Super 1600
Page 25: ...General safety instructions Centaya Super BAH0092 3 01 19 25 Fig 2 Fig 3 Fig 4 ...
Page 97: ...Layout and function Centaya Super BAH0092 3 01 19 97 Fig 98 ...
Page 223: ...Cleaning maintenance and repairs Centaya Super BAH0092 3 01 19 223 ...
Page 225: ...Hydraulic diagram Centaya Super BAH0092 3 01 19 225 Fig 281 ...
Page 227: ...Hydraulic diagram Centaya Super BAH0092 3 01 19 227 Fig 282 ...
Page 228: ......
Page 229: ......