Repairing the implement
10
10.1 Maintaining the implement
10.1.1 Maintenance schedule
After initial operation
Checking the levelling connection
Checking the rollers
Checking the hydraulic hose lines
as required
Replacing tines with compression spring overload
safety
Replacing tines with shear bolt overload safety
Replacing C-Mix-3 coulters
Replacing the C-Mix-3 Clip coulter
Replacing the discs
daily
Checking the top link pin and lower link pin
Every 50 operating hours / weekly
Checking the hydraulic hose lines
Every 200 operating hours / Every 3 months
Checking the rollers
CMS-T-00004063-J.1
CMS-T-00004064-F.1
10 | Repairing the implement
MG6806-EN-GB | Q.1 | 26.07.2022 | © AMAZONE
62
Summary of Contents for Cenio 3000
Page 83: ......