6.3.2
Adjusting the working depth of the
levelling
6.3.3
Preparing the spring steel closer for
operation
6.3.4
Preparing the edge levelling discs
for operation
6.3.5
Adjusting the scraper to the roller
6.3.6
6.3.7
Adjusting the trailing elements
6.4
Preparing the machine for road
travel
6.4.1
Preparing the side elements for
road travel
6.4.2
Putting on the road safety bars
6.4.3
Reducing the implement width to
the permitted transport width
6.5
Calculating the permissible
payload
7
7.1
7.2
8
9
9.1
Uncoupling the 3-point mounting
frame
9.2
Driving the tractor away from the
implement
9.3
9.4
Disconnecting the hydraulic
hose lines
10.1
10.1.1
10.1.2
Replacing tines with compression
spring overload safety
10.1.3
Replacing tines with shear bolt
overload safety
10.1.4
10.1.5
Replacing the C-Mix-3 Clip coulter
10.1.6
10.1.7
Checking the levelling connection
10.1.8
10.1.9
Checking the top link pin and lower
link pin
10.1.10
Checking the hydraulic hose lines
10.2
10.2.1
Overview of lubrication points
10.3
11.1
Loading the implement with a
crane
12 Appendix
12.1
12.2
13 Directories
13.1
13.2
TABLE OF CONTENTS
MG6806-EN-GB | Q.1 | 26.07.2022 | © AMAZONE
II
Summary of Contents for Cenio 3000
Page 83: ......