background image

AGP-2000 Series

Ticket Dispenser

INSTALLATION / OPERATIONS MANUAL

®

Summary of Contents for AGP-2000 Series

Page 1: ...AGP 2000 Series Ticket Dispenser INSTALLATION OPERATIONS MANUAL ...

Page 2: ......

Page 3: ...he latest hardware or firmware version if applicable We recommend that this document be read in its entirety before any attempt is made to oper ate the equipment PROPRIETARY NOTICE This document contains proprietary information and such information may not be reproduced in whole or in part without written permission from Amano Cincinnati Inc 140 Harrison Avenue Roseland New Jersey 07068 ...

Page 4: ......

Page 5: ...iring 3 5 Termination Resistors 3 5 Field Connections 24 VDC 3 6 I O Rack 1 Connections 3 7 I O Rack 2 Connections 3 8 Typical Input Output Modules 3 9 AGP 2000 Connections to an AGP 1700 Gate 3 10 AGP 2000 Connections to an AGP 1700 Gate and MAG 120 Reader 3 11 AGP 2010 Schematic 3 12 Loading the Ticket Supply 3 13 Intercom Wiring 3 14 Complete the Installation 3 14 Chapter 4 SERVICE 4 1 Door Ope...

Page 6: ...ii AGP 2000 Installation and Operations TABLE OF CONTENTS ...

Page 7: ... is retrieved from the ticket dispenser by the parking patron the AGP 2000 opens the gate allowing the patron to enter the facility The AGP 2000 can also be configured to accept magnetically encoded contract or monthly passcards to enter the lot The patron inserts the passcard into the ticket throat to be read The AGP 2000 reads the passcard and returns it to the patron The AGP 2000 features stand...

Page 8: ...1 2 AGP 2000 Installation and Operations INTRODUCTION ...

Page 9: ...le Grey top cover Electrical Power Source Input Voltage Service Amperage Model Number 120VAC 60 Hz 10 AMP AGP 2010 220VAC 50 60Hz 5 AMP AGP 2020 Fuses Main Power 120VAC 60 Hz AGC 5 Amp 220VAC 50 60Hz AGC 2 5 Amp RWPV Top GMCV 5Amp 125 Volt Slo Blow RWPV Bottom GDC 1 Amp 250 Volt Warning To reduce the risk of fire replace with same type and rating of fuse Environment 20 F 120 F 29 C 49 C 10 95 rela...

Page 10: ... seconds per week 68 86 F 20 30 C Built in perpetual calender Automatic Daylight Saving Time adjustment Programming On line RS485 via local facility computer Local via hand held wireless remote Ticket Issue Manual push button Semi automatic vehicle presence and push button Fully automatic vehicle presence alone Entry ticket and test ticket issuance Automatic backout ticket voiding Display Graphic ...

Page 11: ... Messages are user programmable Built in intercom for direct communication Aiphone compatible Inputs Loop A Loop C Gate Status Open Closed Lot Full Disable Exit Gate Open Outputs Arm Exit Reader Non Resettable Tickets Issued Count Open Gate Close Gate Lot Full Ticket In Throat Ticket In Count Heater Fan Heater Elements Note Additional Inputs and Outputs are available Refer to I O Rack 2 Connection...

Page 12: ...ism for tickets 5 Interface PCB Controls I O functions of RWPV motors printers etc 6 Main Logic PCB Controls all functions of the Ticket Dispenser 7 Dual Feed Mechanism Allows for dual ticket feed 8 Drive Gears and Belts Drives the RWPV mechanism 9 Ribbon Cartridge Easy to replace and cost effective 10 Printer Release Latch Access to clear ticket jams and change ribbon 11 Cover High impact weather...

Page 13: ...connections 24 VDC 7 Main Power Breakers Cuts off power to entire unit for service 8 Main Power Box High voltage main power field connections 9 Ticket Carton Brackets Provides for dual ticket feed cartons 10 Ticket Bulb To keep ticket supply dry 11 Utility Power Outlets For powering peripheral devices 12 I O Rack Facilitates expanded monitoring and intelligent control 13 Front Cover Latch Holds fr...

Page 14: ...2 6 AGP 2000 Installation and Operations SPECIFICATIONS ...

Page 15: ...oiding the warranty for repair or replacement of the unit Unpack the Unit After you remove the shipping carton unpack the internal components 1 Unlock and open the side door panel if you have not already done so 2 Pull the front cover release latch upward 3 Pull the rear cover release latch towards the front of the unit 4 Slide the cover up to open it The cover can be removed if needed 5 Remove th...

Page 16: ...lts The AGP 2000 directly replaces the ETP 10 20 ETP 12 22 and also CTP models if a galvanized base was previously used To mount the AGP 2000 in place 1 Make sure the power source to the field wiring is disconnected 2 Make sure the installed field wiring is located so that it won t be pinched when mounting the AGP 2000 3 Mount the AGP 2000 pedestal to the mounting bolts using the four 13 nuts remo...

Page 17: ... screws securing the ticket box bracket Set the bracket and screws aside 5 Loosen the screws securing the Field Connect Box cover Set the cover and attached screws aside 6 Remove one of the the Conduit Knockouts on the bottom of the Field Connect Box 7 Run the main power and ground connections from the field wiring up through the Conduit Knockout Hole 8 Make sure there is no more than 6 15 24 cm o...

Page 18: ...ons Then proceed as follows 15 Turn both Main Power Breakers ON 16 Turn the Logic Power Switch ON The switch will illuminate when it is in the ON position Connection Locations Refer to Figure 3 3 below for the location of the Communication Interconnect PCB À the Field Connections Terminal Block TB2 Á and the I O Rack  The illustration also shows the optional secondary I O Rack AGP 0502 A527 à ins...

Page 19: ...nation Resistors for Com1 and Com2 The Termination Resistors are mounted on the RWPV Main Logic PCB The AGP 2000 is shipped with the Termination Resistors in the terminated left position The Termination Resistors should remain in the terminated position if this is the last unit on the RS485 network You must move the Termination Resistors to the unterminated right position if this is not the last u...

Page 20: ...he Field Connections Terminal Block TB2 shown below This terminal block supplies 24 VDC and 0 VDC for I O Rack connections NEC Class 2 wiring only 3 6 AGP 2000 Installation and Operations INSTALLATION Figure 3 6 Field Connections Terminal Block TB2 with cover removed ...

Page 21: ...to Figure 3 3 for the location of the I O Racks Figure 3 7 below illustrates I O Rack 1 connections NEC Class 2 wiring only and Jumper Settings AGP 2000 Installation and Operations INSTALLATION 3 7 Figure 3 7 I O Rack 1 Connections and Jumper Settings ...

Page 22: ...igure 3 8 below illustrates the optional I O Rack 2 connections NEC Class 2 wiring only and jumpers Order I O Rack 2 as product AGP 0502 A527 Installation instructions are included in the kit 3 8 AGP 2000 Installation and Operations INSTALLATION Figure 3 8 I O Rack 2 Connections and Jumper Settings ...

Page 23: ...llowing figures illustrate typical Input and Output module schematics AGP 2000 Installation and Operations INSTALLATION 3 9 Figure 3 9 Typical 24VDC 120VAC Input Module Schematic Figure 3 10 Typical 24VDC 120VAC Output Module Schematics ...

Page 24: ...AGP 2000 Connections to an AGP 1700 Gate 3 10 AGP 2000 Installation and Operations INSTALLATION Figure 3 11 AGP 2000 Connections to an AGP 1700 Gate ...

Page 25: ...AGP 2000 Connections to an AGP 1700 Gate and MAG 120 Reader AGP 2000 Installation and Operations INSTALLATION 3 11 Figure 3 12 AGP 2000 Connections to an AGP 1700 Gate and MAG 120 Reader ...

Page 26: ...AGP 2010 Schematic 3 12 AGP 2000 Installation and Operations INSTALLATION Figure 3 13 AGP 2010 Schematic ...

Page 27: ...ticket boxes if dual ticket feed DTF will be used in the bottom ticket bracket Place 3 inch ticket boxes in the machine so the words Machine Tickets are in the upper right of the box Three inch tickets will be fed into the printer mechanism with the preprinted numbers on top towards the rear of the unit and the magnetic strip on the right as the tickets exit the machine 6 Feed the tickets from the...

Page 28: ...o the vault reset switch underneath the RWPV Read Write Print Vault mechanism 2 Refer to the AGP 2000 Programming Manual ATD 107500 to program and test the unit 3 After programming and testing the AGP 2000 close and latch the top cover then close and lock the pedestal door 4 Remove the protective covering from the front panel 3 14 AGP 2000 Installation and Operations INSTALLATION Figure 3 15 AGP 2...

Page 29: ...ns Mode 1 When the door panel is in place the switch is fully engaged for normal operation Mode 2 When the door panel is opened the switch automatically extends to this position The Door Open alarm is activated Ticket Jam Reset The Door Open switch can also be used to reset the unit if a ticket jam has occurred Refer to the Ticket Jam section in this chapter for more information AGP 2000 Installat...

Page 30: ... Position the ribbon cartridge so that the adjustment knob is towards you 4 Snap the ribbon cartridge into place passing the ribbon under the print head 5 Make sure the cartridge is fully seated on both sides Push down on the Top Retainer Tab to make sure it is securely fastened over the top of the cartridge 6 Make sure the ribbon passes under the print head and is not twisted Turn the adjustment ...

Page 31: ...3 below to locate the Printer Release Latches on both sides of the printer Pull both of the latches forward to release the printer 5 Tilt the printer assembly up and back 6 Locate the pulleys on the left side of the upper mechanism Rotate each set of motor driven pulleys to move the ticket towards the front or rear of the mechanism 7 Grasp the jammed ticket and remove it from the mechanism 8 Tilt ...

Page 32: ... boxes 3 Remove the top of the new ticket boxes and discard 4 Place one ticket box in each of the ticket box brackets Place the boxes in the unit so that the words Machine Tickets are in the upper right corner of the box The tickets will be fed into the ticket transport with the preprinted numbers towards the rear and bottom of the unit and the magnetic strip up and to the right as the tickets exi...

Page 33: ... door panel if you have not already done so 3 Tear off the tickets from all ticket boxes 4 Press and release the Ticket Issue button 5 All motors in the RWPV will run until all the sensors are clear Any tickets remaining in the RWPV will be ejected Remove any rejected tickets Note All RWPV motors will stop if the Ticket Issue button is pressed a second time The display will show a TICKET JAM if th...

Page 34: ...Ticket Vault Bin The AGP 2000 is equipped with a ticket vault bin to store retracted and vaulted tickets Tickets are retracted when a backout situation occurs or when the ticket issue timer has run out When the internal Ticket Vault Counter reaches 50 tickets the AGP 2000 will no longer issue tickets and the display will change to the following To recover from a full ticket vault bin and a CLOSED ...

Page 35: ... you perform the following Preventative Maintenance procedures RWPV Use commercially available canned or compressed air to periodically blow out dust buildup from the read write print vault mechanism This includes the dual ticket feed module ticket transport rollers optic sensors printer mechanism and ticket throat Magnetic Head Periodically unlatch and open the printer mechanism to clean the magn...

Page 36: ... 3 Locate the mounting screw located in the center of the PCB near the sensor connector 4 Use a phillips head screw driver to remove the mounting screw and set it aside 5 Pull the circuit board straight out unplugging it from the main PCB 6 To replace the Interface PCB reverse this procedure To remove the Main PCB 1 Remove the Interface PCB as outlined above 2 Disconnect the printer cable 3 Remove...

Page 37: ...d return to the Main Test menu 8 Press the POWER button to return to the Normal Mode Clearing the Ram If it becomes necessary to completely clear the memory and return the system to it s default configuration you must temporarily disconnect the battery located on the back of the Main PCB as follows 1 Turn off the machine 2 Disconnect the comms cables see Figure 3 4 3 Using needle nose pliers caref...

Page 38: ...4 10 AGP 2000 Installation and Operations SERVICE ...

Page 39: ......

Page 40: ...1082 800 554 1031 Chicago Sales Office 847 718 1100 800 323 8864 Cincinnati Sales Office 513 697 9000 800 487 7564 Dallas Sales Office 972 241 09146 800 527 4037 Los Angeles Sales Office 714 970 2280 800 854 5977 New Jersey Sales Office 973 403 1900 800 526 2559 Toronto Sales Office 905 624 4085 800 387 3388 ATD 105002 Copyright 2000 Printed in U S A 7 00 0 ...

Reviews: