Measurement With the Outer Case
Removed
DANGER
!
To avoid risk of personal injury or death avoid
contacting any high voltage components.
Whenever you replace the magnetron, measure for
radiation leakage before the outer case is installed and
after all necessary components are replaced or
adjusted. Special care should be taken in measuring
around the magnetron.
Measurement With a Fully Assembled Oven
After all components, including the outer panel are fully
assembled, measure for radiation leakage around the
door periphery, the door viewing window, the exhaust
opening, and air inlet openings.
Record Keeping and Notification After
Measurement
1
.
After any adjustment or repair to a microwave oven,
a leakage reading must be taken. Record this
leakage reading on the repair ticket even if it is zero.
2. A copy of the repair ticket and the microwave
leakage reading should be kept by the repair facility.
Microwave Leakage Test
WARNING
!
Check for radiation leakage after servicing. Should the
leakage be more than 4mW/cm
2
inform Amana
immediately. After repairing or replacing any radiation
safety device, keep a written record for future
reference, as required by D.H.H.S. and HEW
regulations. This requirement must be strictly
observed. In addition, the leakage reading must be
recorded on the service repair ticket while at the
customer’s location.
Equipment
• Electromagnetic radiation monitor
• 600 cc glass beaker
Procedure For Measuring Radiation
Leakage
Note before measuring -
• Do not exceed meter full scale deflection. Leak
monitor should initially be set to the highest scale.
• To prevent false readings the test probe should be
held by the grip portion of the handle only.
• The scan speed is equal to one inch per antenna
revolution or one inch per second if antenna speed is
unknown.
• Areas to be checked are all door seal areas and any
venting parts.
• Leakage with the outer panel removed, 4mW/cm2 or
less.
• Leakage for fully assembled oven with door normally
closed, 4mW/cm2 or less.
• Leakage for a fully assembly oven (before the latch
switch (primary) is interrupted) while pulling the door,
4mW/cm2 or less.
1. Open the oven door and verify that there is only one
rack in place on the bottom rack hooks.
2 . Pour 275 ± 15 cc (9 oz ± 1/2 oz) of 20 ± 5°C. (68±
9°F.) water in a glass beaker which is graduated to
600 cc and place the beaker in the center of rack.
3. Set the radiation monitor to 2450 MHz and use it
following the manufacturer’s recommended test
procedure to assure correct results.
4. While measuring the leakage, always use the two
inch (5 cm) spacer supplied with the probe.
5. Press the start pad or turn on the timer and with the
magnetron oscillating, measure the leakage by
holding the probe perpendicular to the surface being
measured.