4
Operating interval of pressure in water
supply network 0,5 – 6,0 Atm.(50-620kPa).
Recommended pressure interval in water
supply network 2,0 – 5,0 Atm (206 – 515
kPa). Difference of cold and hot water
pressure should not /- 10%. In
case of deviation of water supply system
pressure parameters to the specified values
installation of devices for pressure increase/
reduction is required.
To avoid mechanical (abrasive) particles
penetration inside the product it is compul-
sorily required to install filters of 100-300
mk.
Mixer installation.
1. Disconnect hot and cold water supply
system
2. Remove (screwloose) aerator (to avoid
aerator clogging during first water startup).
3. Fix mixer at the sanitary ware using fit-
ting included into the delivery set.
4. Connect mixer to the water supply sys-
tem. Switch on water supply system. Check
leakproofness of all connections during
mixer closed position. When necessary ar-
range additional tightening and sealing of
connections (when closing valves of supply
pipelines are closed).
5. Open cold and hot water supply for short
period of time (for washing of pipes), then
close the water supply and install (screw
tight) the aerator.
ø35mm Min
ø38mm Max
Hot
29
供水网络工作压力区间为0.5-6.0大气压(50-
620千帕)。建议供水网络压力差为2.0-5.0大
气压(206-515千帕)。冷热水压力差+/-10%左
右。如供水网络压力参数不符合上述要求,需
安装增压阀/减压阀。
1、切断冷热水供水
2、取下(拧下)起泡器(为避免初次通水时造
成起泡器堵塞)。
3、 使用配套提供的紧固件将龙头固定在卫浴
产品上。
4、将龙头与供水系统相连,打开供水系统,检
查龙头关闭状态下各连接部位的密闭性。如有
必要,可调整连接部位的松紧性和密闭性(请
确保供水管道阀门处于关闭状态)。
5、打开冷热水供水并稍微持续一段时间(以
冲洗管道),然后切断供水并安装(拧上)起
泡器。
ø35mm Min
ø38mm Max
Hot
Summary of Contents for LIKE F8002100
Page 1: ...32 4 5 100 300 1 CLOTH LIKE...
Page 13: ...20 100 300 i 0 5 6 0 50 620 2 0 5 0 206 515 10 F8010000 F8020000 13 F8002100 F8093000 RUS...
Page 15: ...18 F8002100 F8093000 I i i i UA 15 100 300 0 5 6 0 50 620 2 0 5 0 206 515 10 F8010000 F8020000...
Page 16: ...16 1 150 150mm Spirit Level 37 44 mm 17 2 3 100 300 4 5 6 7 CLOTH...