42
Gutter and Downpipe Installation
13
Fit the ridge end caps to your greenhouse with the four 25mm nails provided. Line this up with the top
edges of the ridge cover cap. The nails should secure in the cloaking strip on the front (diagram 52).
When you are happy with the final position of your greenhouse and all the sides are
vertical and square you can fix the greenhouse to the ground. Use brown rawl plugs and
50mm screws to secure it through the base brackets previously attached (diagram 53).
Diagram 53
50mm Scre
w
Internal
Diagram 52
25m
m N
ail
EV016
8
External