1200-S, 1200-UP •
INSTALLATION
/
OPERATION
/
SERVICE MANUAL
-
PG
. 19
T H E R M O S T A T A C C U R A C Y
S E R V I C E
The electronic thermostat is a precise
instrument and is designed to offer trouble free
service. If you suspect the temperature inside
the holding compartment does not match the
temperature indicated on the digital display,
follow the instructions listed below.
1.
Check to make certain the unit voltage
matches the power source. A power source
less than that required to operate the unit
will result in inaccurate temperatures.
2.
Verify the temperature inside the holding
compartment with a qualify thermal
indicator.
A.
With the exception of the wire shelves,
completely empty the holding
compartment.
B.
Make certain the holding cabinet sensor,
located inside the holding compartment
at the left side of the unit, is completely
clean.
C.
Suspend the thermal indicator in the
center of the holding compartment.
D.
Allow the temperature set on the
electronic thermostat to stabilize for a
minimum of one hour before comparing
the digital display with the reading on
the thermal indicator.
DO NOT OPEN THE CABINET DOOR(S)
DURING THE TEMPERATURE
STABILIZATION PERIOD.
If the reading on the thermal indicator does not
match the digital display, there may be a
problem with the air sensor. See
troubleshooting guide in this manual; or call
the factory service department for advice.
D A N G E R
DISCONNECT UNIT FROM
POWER SOURCE BEFORE
CLEANING OR SERVICING.
C A U T I O N
THIS SECTION IS PROVIDED FOR THE ASSISTANCE
OF QUALIFIED SERVICE TECHNICIANS ONLY AND
IS NOT INTENDED FOR USE BY UNTRAINED OR
UNAUTHORIZED SERVICE PERSONNEL.
Summary of Contents for Halo Heat 1200-S
Page 31: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 30 ...
Page 32: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 31 ...
Page 33: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 32 ...
Page 34: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 33 ...
Page 35: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 34 ...
Page 36: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 35 ...
Page 37: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 36 ...
Page 38: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 37 ...
Page 39: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 38 ...
Page 40: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 39 ...
Page 41: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 40 ...
Page 42: ...1200 S 1200 UP INSTALLATION OPERATION SERVICE MANUAL PG 41 ...