DISTRIBUTION AMPLIFIERS
5
APPLICATION DIAGRAM
5
INSTALLING YOUR DISTRIBUTION
AMPLIFIER
6
Step 1.
Make sure that the proper power supply is
being used with the unit.
The use of an incorrect power supply
can result in equipment damage not
covered by warranty.
Step 2.
Connect the power supply to the unit.
The power indicator LED on the front
panel will light. This indicates that the unit
is operational.
Step 3.
Connect the high resolution RGsB or
RGBS source to the
DA1913GL
using
coaxial cables with BNC connectors while
making sure that the colors match
correctly. Then connect one or two
monitors or projectors to the output(s) of
the
DA1913GL
. The monitors or
projectors must be scan-rate compatible
with the source signal resolution. The
DA1913GL
does not affect the scan rate.
Step 4.
If the image is less than perfect, check all
the connections. The unit is very reliable
and seldom will this be the cause of
malfunction. Poor quality cables may
degrade the performance of the product.
Make sure that the cables used
are coaxial cables and that all pins are in
good condition.
After each step is completed, the unit
should now be fully operational.
CONGRATULATIONS! YOU ARE DONE.
OPERATION
7
The
DA1913GL
will operate successfully as long
as cables are attached properly and other
specifications are followed. There are no other
adjustments necessary to operate the unit
If you experience any problems, please call
1-800-258-4623 or 1-714-990-2300 for
international calls.